background image

2

CONTENTS

GENERAL SPECIFICATIONS ........................................................................................................................................................ 3

1. RECEIVING THE EQUIPMENT ................................................................................................................................................ 3

2. PREPARING THE PLACE FOR THE INSTALLATION ......................................................................................................... 4

3. POSITIONING THE SPA ........................................................................................................................................................... 4

4. ELECTRICAL CONNECTIONS ................................................................................................................................................. 4
 

4.1. Earth connection ........................................................................................................................................................... 4

 

4.2. Equipotential connection ........................................................................................................................................... 4

 

4.3. Mains situation ............................................................................................................................................................... 4

 

4.4. Mains connection .......................................................................................................................................................... 4

5. HYDRAULIC CONNECTION ................................................................................................................................................... 5

6. FILLING AND EMPTYING THE SPA ...................................................................................................................................... 5

7. VENTILATION ............................................................................................................................................................................. 5

Содержание Broadway Round

Страница 1: ...1 Installation Instructions SPA BROADWAY ROUND...

Страница 2: ...PREPARING THE PLACE FOR THE INSTALLATION 4 3 POSITIONING THE SPA 4 4 ELECTRICAL CONNECTIONS 4 4 1 Earth connection 4 4 2 Equipotential connection 4 4 3 Mains situation 4 4 4 Mains connection 4 5 HYDRA...

Страница 3: ...cally the blower pump Between 15 and 12 blower operates for 1 minute every 120 minutes Between 12 and 9 blower operates for 1 minute every 60 minutes Between 9 and 6 blower operates for 1 minute every...

Страница 4: ...r next to a side wall remember toleave0 5metresorconnectionorinstallationworkorfittrapdoors with a minimum size of 1700x700 mm for accessing all the sides for post installation maintenance This spa ca...

Страница 5: ...Vol 3 Please note The space below the spa tank is considered volume 3 as a tool is required to remove the panels 6 FILLING AND EMPTYING THE SPA Never use the air blower circuit to fill the spa The spa...

Страница 6: ...the Broadway Round D D P E H G F K R V T Z2 Z1 I D 2 air regulators P Control panel E Blower R Heating element F Filter skimmer T Empty fill tap G Ozone generator V Empty fill H Filter hydromassage p...

Страница 7: ...ER OZONE L1 N PE R91 R90 R89 R88 R120 R119 R118 R94 N L L N PE L N PE PUMP 1 PUMP 2 L LO N PE PUMP 2 L HI N PE PUMP 1 L LO N PE L HI N PE L1 L2 L3 N PE INPUT VOLTAGE LIGHT RELAY 30A 250VAC RELAY 16A 2...

Страница 8: ...ch km 2 5 B P 571 26000 Settat Maroc Telf 212 0 23 40 59 41 212 0 23 40 03 39 Fax 212 0 23 40 59 42 Roca GmbH Feincheswiese 17 56424 Staudt Deutschland Tel 49 0 2602 93610 Fax 49 0 2602 936 122 Roca P...

Отзывы: