Transportion of the machine
(fig. 2)
Depending the method of transport or shipping, you will receive the machine in a crate or on
transport blocks.
Remove the sides of the crate and cover and slide the hoisting equipment under the table as
shown in fig, 2.
The machine can be lifted with a small crane, or a forklift, but severe shocks must be avoided.
Place the machine on a concrete base, and level the machine perfectly horizontally in both
directions.
Fig.2
Electrical connections
(fig 3)
The electrical connections must be carried out by a qualifid electrician who is able to
calculate the exact needed wire section and caliber of fuses.
- Check that the mains voltage of your machine corresponds with the voltage in your workshop.
- Open the electrical connection box at the side of the machine (fi, 2).
- Connect the three phases to the terminals marked L1, L2, L3 (fi,3).
- The neutral conductor (blue) it is to be connected to the terminal N.
- Connect the earthing (green-yellow) to the terminal marked with the earth symbol PE.
- Check fist if the spindle runs free and if all protections are mounted before starting up the
machine.
- If the rotation direction of the spindle is not correct, the leads L1, and L2 must be exchanged.
Содержание LBM
Страница 16: ...16 V0517 LBM ...
Страница 28: ...28 V0517 LBM Nederlands Français English Deutsch Fig 4 Fig 5 Fig 6 ...
Страница 59: ...LBM V0517 59 ...
Страница 60: ...60 V0517 LBM ...
Страница 61: ...LBM V0517 61 ...
Страница 62: ...62 V0517 LBM ...
Страница 63: ...LBM V0517 63 ...
Страница 64: ...64 V0517 LBM ...
Страница 65: ...LBM V0517 65 ...
Страница 66: ...66 V0517 LBM ...
Страница 67: ...LBM V0517 67 ...
Страница 68: ...68 V0517 LBM ...
Страница 69: ...LBM V0517 69 ...
Страница 70: ...70 V0517 LBM ...
Страница 71: ...LBM V0517 71 ...
Страница 72: ...72 V0517 LBM ...