![Roberts Gorden NDUSTRIA NHE Series Скачать руководство пользователя страница 45](http://html.mh-extra.com/html/roberts-gorden/ndustria-nhe-series/ndustria-nhe-series_installation-operation-and-service-manual_1469688045.webp)
SECTION 8: V
ENTING
41
SECTION 8: VENTING
8.1 Venting
This heater is considered a Category I or Category
III vented appliance. The Serial plate on the heater
will indicate vent Category and this manual will
describe the installation requirements for each vent
Category.
This heater must be vented in accordance with the
rules contained in this manual and with the following
national codes and any state, provincial or local
codes which may apply:
United States:
Refer to National Fuel Gas Code
NFPA 54/ANSI Z223.1 - latest revision.
Canada:
Refer to Natural Gas and Propane
Installation Code CSA B149.1 - latest revision.
Exhaust end of heater will accept a 4'' (10 cm) vent
pipe using the vent adapter (P/N 90502701). To
prevent leakage of condensation, install the vent
adapter with the seam on top and seal the joint using
a high temperature silicone sealant.
Maintain a minimum of 6" (15 cm) clearance around
all single wall flue pipe.
Any portion of vent pipe passing through a
combustible wall must have an approved thimble
to conform with the above listed codes.
Vent pipe must be sloped downward away from the
heater 1/2'' (1 cm) for every 20' (6 m).
The heater may be individually vented or common
vented. When venting horizontally, a maximum of
two heaters can be commonly vented.
. When venting vertically, a maximum of
four heaters can be commonly vented.
The heater may also be installed unvented in certain
circumstances according to building ventilation
codes. Refer to the above codes
for further information. Unvented
operation also requires compliance with the
clearances to combustibles given
The bottom of the vent or air intake terminal shall not
be located less than 1' (0.3 m) above grade level.
The vent shall not terminate less than 7' (2.1 m)
above grade where located adjacent to public
walkways.
Vent terminal must be installed at a height sufficient
to prevent blockage by snow, and building materials
protected from degradation by flue gases.
Secure all joints with #8 x 3/8 sheet metal screws.
Seal all joints with high temperature silicone sealant.
Vent terminal must be beyond any combustible
overhang.
8.1.1 United States Requirements
Vent must terminate at least 3' (0.9 m) above any
forced air inlet located within 10' (3.1 m).
Vent must terminate at least 4' (1.2 m) below, 4'
(1.2 m) horizontally from, or 1' (0.3 m) above any
door, operable window, or gravity air inlet into any
building.
WARNING
Carbon Monoxide Hazard
Heaters installed unvented must be interlocked
with sufficient building exhaust.
Heaters must be installed according to the
installation manual.
Failure to follow these instructions can result
in death or injury.
WARNING
Cut/Pinch Hazard
Wear protective gear during installation,
operation and service.
Edges are sharp.
Failure to follow these instructions can result
in injury.
Содержание NDUSTRIA NHE Series
Страница 2: ......
Страница 4: ......
Страница 21: ...SECTION 6 HEATER INSTALLATION 17 FIGURE 16 Linear Heater Layout Overview ...
Страница 22: ...NHE SERIES INSTALLATION OPERATION AND SERVICE MANUAL 18 FIGURE 17 Linear Heater Layout Overview Continued ...
Страница 37: ...SECTION 7 OPTIONAL HEATER ACCESSORIES 33 FIGURE 26 U Tube Heater Layout Overview ...
Страница 38: ...NHE SERIES INSTALLATION OPERATION AND SERVICE MANUAL 34 FIGURE 27 U Tube Heater Layout Overview Continued ...
Страница 69: ...SECTION12 TROUBLESHOOTING 65 ...
Страница 70: ...NHE SERIES INSTALLATION OPERATION AND SERVICE MANUAL 66 12 2 Manifold Gas Pressure Setting Side View of Heater ...
Страница 74: ...NHE SERIES INSTALLATION OPERATION AND SERVICE MANUAL 70 ...
Страница 76: ...NHE SERIES INSTALLATION OPERATION AND SERVICE MANUAL 72 ...
Страница 77: ...SECTION 15 THE NDUSTRIA NHE WARRANTY 73 2020 ...
Страница 78: ...NHE SERIES INSTALLATION OPERATION AND SERVICE MANUAL 74 ...