![Roberts Gorden NDUSTRIA NHE Series Скачать руководство пользователя страница 16](http://html.mh-extra.com/html/roberts-gorden/ndustria-nhe-series/ndustria-nhe-series_installation-operation-and-service-manual_1469688016.webp)
NHE-S
ERIES
I
NSTALLATION
, O
PERATION
AND
S
ERVICE
M
ANUAL
12
Table 3: Component Package Guide
Although not recommended, additional tube lengths may be added to the heater. Tubing must be aluminized
(heat-treated), or porcelain coated. Additional tube lengths beyond the specified minimum tubing length are
considered vent pipe for length determination. Maximum vent length allowed is 45' (13.7 m) total.
Model
Tubing Length
Standard Core Packages
Minimum
Aluminized
Stainless Steel
NHE-40
10’ (3m)
CP10ALUM
CP10ALUM
NHE-60
20’ (6m)
CP20ALUM
CP20ALUM
NHE-80
20’ (6m)
CP20ALUM
CP20ALUM
NHE-100
30’ (9m)
CP30ALUM
CP30ALUM
NHE-125
30’ (9m)
CP30ALUM
CP30ALUM
NHE-150
40’ (12m)
CP40ALUM
CP40ALUM
NHE-175
50’ (15m)
CP EXP20ALUM
CP EXP20ALUMSS
Содержание NDUSTRIA NHE Series
Страница 2: ......
Страница 4: ......
Страница 21: ...SECTION 6 HEATER INSTALLATION 17 FIGURE 16 Linear Heater Layout Overview ...
Страница 22: ...NHE SERIES INSTALLATION OPERATION AND SERVICE MANUAL 18 FIGURE 17 Linear Heater Layout Overview Continued ...
Страница 37: ...SECTION 7 OPTIONAL HEATER ACCESSORIES 33 FIGURE 26 U Tube Heater Layout Overview ...
Страница 38: ...NHE SERIES INSTALLATION OPERATION AND SERVICE MANUAL 34 FIGURE 27 U Tube Heater Layout Overview Continued ...
Страница 69: ...SECTION12 TROUBLESHOOTING 65 ...
Страница 70: ...NHE SERIES INSTALLATION OPERATION AND SERVICE MANUAL 66 12 2 Manifold Gas Pressure Setting Side View of Heater ...
Страница 74: ...NHE SERIES INSTALLATION OPERATION AND SERVICE MANUAL 70 ...
Страница 76: ...NHE SERIES INSTALLATION OPERATION AND SERVICE MANUAL 72 ...
Страница 77: ...SECTION 15 THE NDUSTRIA NHE WARRANTY 73 2020 ...
Страница 78: ...NHE SERIES INSTALLATION OPERATION AND SERVICE MANUAL 74 ...