
1 Introduction
Manual TRZ 03· EN08 2018 September, 10th
24
Oxygen (100%)
O
2
1,43
Standard Special design
Pentane
C
5
H
12
3,46
Standard
Propane
C
3
H
8
2,02
Standard
Propylene (gaseous) C
3
H
6
1,92
Standard Special measuring element
Sulfur dioxide
SO
2
2,93
Special
Special design
City gas
Standard
1.14 Installing the device in the pipeline
The units of RMG are equipped with flanges. The flange connections for the con-
nected pipes must comply with the connecting dimensions of the flanges of the
unit:
• ANSI-pressure levels: Flange in accordance with ASME B 16.5.
• DIN-pressure levels: Flange in accordance with DIN EN 1092.
Danger
Gas leakage for the wrong gaskets. If wrong flange gaskets are used for
connecting turbine gas meters, gas mayflow through leaks resulting in an
explosive gas mixture.
Poisoning and explosion hazard!
In addition, the stress of the flange is increased inadmissible when
tighteningthe bolts.
Make sure that no flange gaskets are protruding into the pipe.
Pay attention to a save mounting / hanging-up of the TRZ03 during
assembly toavoid the risk of bruising. Avoid having your fingers (or other
body parts) between any openings and gaps that are moved together when
tightening the flanges!