1 Introduction
Manual TRZ 03· EN08 2018 September, 10th
6
Danger
The installation and removal of the TRZ03 or to the TRZ03 connected
convertor may only be carried out in an explosion-free, de-pressurized
atmosphere. It is important to pay attention to the descriptions of the
operation manual during the installation process.
It is generally recommended to ask the RMG Service for any installation or
removal.
After working on pressurized components, a control of leaks must be
carried out.
All points above have to be considered for any repair and maintenance
and in general, when an opening of the meter (convertor) is required.
Parts to lock the flanges, locking screws, fittings and check valves, oil
supply and the pressure tap fittings, valves, HF pulse device, protecting
pipe and rotating adapter may not be opened during operation.
1.1.4.3
Danger when using, servicing and maintaining
Operating personnel
The operating personnel are to use and operate the
device within the scope of the intended purpose.
Maintenance personnel
Work on the device must only be carried out by specialist
personnel that can carry out the respective work assigned
to them as a result of their training, knowledge and
experience as well as the applicable regulations. These
specialist personnel are familiar with the legal guidelines
for accident prevention and can evaluate and avoid
possible risks by themselves.
Maintaining and cleaning
Maintenance and cleaning must only be carried out by the
respectively qualified specialist personnel.
Danger
If staff carry out work without sufficient qualification, risks may be
underestimated when working. Explosion or fire may happen. If work is
carried out in hazardous areas on voltage supporting equipment, resulting
sparks may cause an explosion.