background image

2.2 Adjustment of the discharge valve

The discharge valve is delivered from the plant with the main 

adjustment. The necessary rotation  of the spindle for this 

adjustment is given on the picture situated on the pilot (see 

drawing on the right).

By turning the spindle left to the bleed adjustment " - ", it is 

possible to adapt the device to special operation instructions 

-additionally to change the auxiliary pressure- 

f.i. by regulation variations of "pressure picks" after a quick 

closing of the stop organ preswitched. 

Verstärkungseinstellung
Bleed adjustment
Adjustage d`amplification

X=

Grundeinstellung:
Linksdrehen bis Anschlag
X Umdrehungen nach rechts

Basic adjustment:
Turn anti-clockwise to the stop
turn spindle X times clockwise

Adjustage de base: 
Tournez à gauche jusqu à l `arret
Apres à droite par X tours

610.20 p. 5

rotation

adjusting spindle

3. Special Maintenance Instructions

3.1 Auxiliary pressure stage (see page 8)

Diaphragm (68) 

By dismantling, put the cover (69) off, put the diaphragm (68) on the side of the inlet pressure connection and

hang the diaphragm on the side outside the joint (80).

Sealing cone (81)  

To dismantle the sealing cone, the screws (98) must be unscrewed and the complete joint (80) 

must be put off. A mark of the sleeve corner (83) on the sealing surface of the sealing cone (81) is normal.

By installing the sealing cone, the position of the lever joint must be controlled after the installation of the joint and

newly adjusted if necessary.

The correct adjustment is given if the lever is manually put out (piston in closing position) and the superior corner of 

the lever is parallel to the diaphragm support.

A possible and necessary correction is obtained by underlaying the different thicker sealing rings (51, 85) under the 

intermediary piece.

3.2 Control stage - Tool M and N (see p. 6 and 8)

Control rod (16, 76)

The control rod must lightly slide in its conduction. By installing the new parts in the outlet pressure stage the 

adjustment measure of the rod must be controlled according to the measurement tool and be corrected if necessary.

The adjustment measure must be put off according to the following drawing.

Adjustment measure for control stage tool N 

Содержание RMG 610

Страница 1: ...l P O Box 10 29 67 D 34029 Kassel Phone 0049 561 5007 0 Fax 0049 561 5007 107 www rmg de Operation and Maintenance 610 20 Spare Parts Edition 02 96 Pilot RS 10d RMG 610 providing all components you ne...

Страница 2: ...th control stage tool N and pilot intermediary part Spare part drawing RMG 610 with pilot and auxiliary pressure stage tool M Spare parts drawing RMG 610 Sleeve for auxiliary pressure stage with lever...

Страница 3: ...the type and composition of the gaseous medium We therefore abstain from imposing any fixed intervals and would rather refer you to the recommen dations given by the DVGW Worksheet G 495 For maintenan...

Страница 4: ...ond pressure or flow regulation valve f i in a heat gas line height of the auxiliary pressure over the outlet pressure with a main valve RMG 322 332 408 409 approx 1 2 bar approx 0 5 1 bar RMG 200 app...

Страница 5: ...gm 68 on the side of the inlet pressure connection and hang the diaphragm on the side outside the joint 80 Sealing cone 81 To dismantle the sealing cone the screws 98 must be unscrewed and the complet...

Страница 6: ...h and must for this reason be shorted by replacing corresponding to the adjustment measure and lastly borderless rounded 3 3 Torque 30 2 5 3 4 Lubricants part to be greased slightly all o rings all sl...

Страница 7: ...4 Spare Parts Drawings 4 1 Spare Part Drawing RMG 610 RS 10d Pilot intermediary part with control stage tool N 610 20 p 7 Parts marked by an asterisk to be kept in stock maintenance...

Страница 8: ...4 2 Spare Parts Drawing RMG 610 RS 10d Control stage tool N auxiliary pressure stage tool M Control stage tool M Parts marked by an asterisk to be kept in stock for maintenance 610 20 p 8...

Страница 9: ...0 RS 10d Parts marked by an asterisk to be kept in stock for maintenance 610 20 p 9 Sleeve for auxiliary pressure stage with lever joint Sectional view A C Spindle for discharge line partial view D Le...

Страница 10: ...g unit manometer union piece protection against overpressure RMG 925 cap nut compression joint material St Ms St LM St St part no pressure stage of the main valve PN 16 PN 25 PN 25 00 026 891 00 031 8...

Страница 11: ...on disc sealing ring piston already made part 2nd stage spring compensation piece pressure spring closing screw body control sleeve 2nd stage pressure spring o ring pressure piece sealing screw adjust...

Страница 12: ...spring alternatively wh 0 1 bar to 1 5 bar wh 0 2 bar to 2 5 bar wh 0 3 bar to 3 5 bar sealing screw control rod 17 long FSt FSt FSt FSt FSt LM St St Ms St KG LM LM KG KG Ms NSt St St KG St LM St KG S...

Страница 13: ...t Ms NSt KG Ms Ms LM LM St St St LM Ms St Ms KG Ms KG St K St St St description material order no 10 014 452 10 014 473 10 014 470 10 014 462 00 018 811 00 018 815 00 030 803 00 030 903 00 030 110 00...

Отзывы: