Caution: Switch off the main power while doing the Power Connection.
Step 1:
Wall mount the Indicator unit nearby motor pump switch/starter location.
The location chosen should be near the window or in open space to ensure good
signal strength.
Step 2:
Connect AC supply (AC 230V) to 1st and 2nd terminal of the indicator as
shown in the gure1.
Step 3:
Unscrew the top panel of transmitter. There is a battery holder inside it.
Put the given Li-ion battery inside the case, according to polarity. RF Signal LED
blinks once.
4. INSTALLATION
2
PROCEDURE
Step 4:
Power ON the indicator. Power ON LED glows in indicator. Take the
transmitter near the tank. To check the communication between transmitter
and Indicator Press the push button inside transmitter for more than 16
seconds. RF Signal LED blinks two times with 5 seconds interval. This ensures
the perfect communication between them.
Step 5:
Now power off the indicator unit.
Contact type sensor connection:
Take
the sensors and cut them according to the levels of the tank and join them with
the sensors lines of transmitter as per color coding. (Refer gure2).
Magnetic
oat sensor connection:
These sensors has 2 wires. Use any one wire in each
sensor as common. Other wire left in each can be used for levels.
Step 6:
Immerse the sensors in the water tank and place at 20%, 40%, 60%,
80% and 100% levels. (Refer gure2)
Note:
Follow Step 5 and 6 for other tanks.(If you have multi-tank models)
Step 7:
Close the top panel of the transmitter using the screws. Place the solar
panel facing sun light using the double side tape.
This completes the installation.
Figure1: Indicator
Figure2: Transmitter
water
Inlet
(Black)CN
(Brown) 20%
(Red) 40%
(Orange) 60%
(Yellow) 80%
(Green) 100%
AC
230V
PHASE
NEUTRAL