C
HAPTER
5
M
AINTENANCE AND
S
ERVICE
P
AGE
47
► Replacing components
Please read the notes at the beginning of Chapter 5
→page 42.
→ Please read the notes in the data sheets of components
C
HANGE OF
S
OLENOID
I
NLET
V
ALVE
1. Release pressure from water supply and
empty measuring-chamber
→ page 40
2. Remove inlet plug from measuring-
chamber
2. Pull down retaining ring on the bulkhead
fitting and remove valve
3. Remove ¼" inlet connector
4. Install the new valve in reverse order
Artikel Nr. 33-090 014
R
EPLACEMENT OF
A
GITATOR
1. Disconnect power and open the lid of the
control box
2. Unplug the red connector
3. Unscrew the mounting screws
4. Install the new agitator in reverse order
Artikel Nr. 33-090 710
R
EPLACEMENT OF
P
ERISTALTIC
P
UMP
M
OTOR
1. Dismantle cartridge of peristaltic pump
→ page 41
2. Disconnect power and open the lid of the
control box
3. Unplug the pump
4. Unscrew the mounting screws of peristaltic
pump motor
5. Remove worn pump motor and install the
new pump motor in reverse order.
Artikelnr. 33-090 026
WARNING
Содержание 30-010321
Страница 1: ...Sycon 2501 Fe On line Analysis of the Iron Content in Water V24 02 2015 U S E R M A N U A L...
Страница 2: ......
Страница 21: ...CHAPTER 3 INSTALLATION AND COMMISSIONING PAGE 21 Fig 3 1 Terminal layout and internal connections...
Страница 22: ...PAGE 22 INSTALLATION AND COMMISSIONING CHAPTER 3 Fig 3 2 Wiring diagram...