C
HAPTER
2
S
PECIFICATION AND
O
VERVIEW
P
AGE
11
C
HAPTER
2
S
PECIFICATION AND
O
VERVIEW
The Limit Analyser is used for the automatic monitoring of hardness in water. We
recommend that the user read this chapter before installation of the device for
safe operation.
2.1
General Specifications
Power-supply
85
… 264 VAC 47… 63 Hz
Power consumption
25 VA (in operation)
Protection class
IP 54
Ambient operating
temperature
5
C
… 45
C
Raw water temperature
5
C … 40
C
Humidity
20%RH
… 90%RH
(without ice or condensation)
Feed water pressure
approx
. 0.5…5 bar (1…2 bar recommended)
Feed water condition
clear, colourless, free of suspended solids, no gas
bubbles
→ Technical data
Installation location
indoor wall mount
External dimensions
without enclosure: 280 [W]
250 [L]
140 [D] mm
with enclosure: 300 [W]
300 [L]
190 [D] mm
Mass
approx. 2.0 kg
→ Analysis characteristics
Evaluation
colorimetric method
Limit value alarm is
defined by the reagent
used
→ bottles volume
500 ml
Limit-Value-Reagents LR:
0.03 mg/l 0.05 mg/l, 0.1 mg/l, 0.2 mg/l, 0.3 mg/l,
0.4 mg/l, 0.5 mg/l, 0.6 mg/l
Limit-Value-Reagents HR:
0.3 mg/l 0.5 mg/l, 1.0 mg/l, 2.0 mg/l, 3.0 mg/l,
4.0 mg/l, 5.0 mg/l, 6.0 mg/l
Reagent consumption
approx. 0.4 ml / analysis
Reagent shelf life
2 years
Relay outputs
3 x Relays
250 VAC / VDC 4 A
potential free outputs NC/NO
1. Limit alarm
2. Unit failure
3. Analysis
Remote signal input
potential free contacts (load 24 V;10 mA)
Water usage
approx. 1000 ml/analysis
→ Drainage volume may vary depending on feed water pressure
and flush time
→ Water inlet and outlet
Water inlet connection
For connecting 6 mm outer diameter pipe
Water outlet connection
→ atmospheric
pressure / open funnel
For connecting 6 mm outer diameter pipe
→ Inlet and outlet pipes are not attached to the device. Please
use specified pipes. Using tubes other than those specified
may cause leakage.
→ Please contact our distributors.
Содержание 30-010321
Страница 1: ...Sycon 2501 Fe On line Analysis of the Iron Content in Water V24 02 2015 U S E R M A N U A L...
Страница 2: ......
Страница 21: ...CHAPTER 3 INSTALLATION AND COMMISSIONING PAGE 21 Fig 3 1 Terminal layout and internal connections...
Страница 22: ...PAGE 22 INSTALLATION AND COMMISSIONING CHAPTER 3 Fig 3 2 Wiring diagram...