C
HAPTER
5
M
AINTENANCE AND
S
ERVICE
P
AGE
42
C
HAPTER
5 MAINTENANCE
AND
SERVICE
To ensure long-term functioning of the analyser, it is necessary to clean the
measuring-chamber and replace worn parts from time to time depending on
the frequency of analyses and general pollution levels. Depending on the
load of the appliance, maintenance work should be done at intervals of
about 6 months.
Maintenance is easy to perform. We recommend that the maintenance is
performed by trained personnel. Always observe the following safety
instructions.
→ Ideally, the maintenance work should be carried out in connection with
the maintenance of the water treatment plant or during operating pauses.
Prior to the service, it is advisable to switch off the analyser at the main
switch.
→ it is not necessary to open the control box in order to carry out
maintenance
WARNING: In the case the cover of the control box is opened, note that
230 Vac is applied to terminal blocks 1-6 and, depending on
the wiring, to the relay output terminals 7-12.
Contact can lead to serious personal injury.
→ Mortal danger
→ Risk of injury
→ By improper handling can damage the machine
.
NB. During your maintenance work no analysis can be carried out and a
hardness leakage may not be detected.
.
Switch off the water supply before disconnecting the inlet water pipe.
→ Water can damage the electronics.
When handling the reagent, take care that your eyes, skin and clothes do
not come in contact with the liquid.
→ →Follow the instructions in the safety data sheets.
→Wear suitable protective clothing i.e. Work wear; laboratory gloves;
eye protection.
NOTE
ELECTRICITY
WARNING
WARNING
WARNING
PRESSURE
Содержание 30-010321
Страница 1: ...Sycon 2501 Fe On line Analysis of the Iron Content in Water V24 02 2015 U S E R M A N U A L...
Страница 2: ......
Страница 21: ...CHAPTER 3 INSTALLATION AND COMMISSIONING PAGE 21 Fig 3 1 Terminal layout and internal connections...
Страница 22: ...PAGE 22 INSTALLATION AND COMMISSIONING CHAPTER 3 Fig 3 2 Wiring diagram...