Installation
Figure 3.2
Cable Installation Methods
3.3.
Apply Power to the Unit
Once the SC is connected to the unit, power may be applied
A dedicated circuit breaker must be provided in the building within close proximity
to the LD5100 and be clearly marked as the disconnecting device for this unit.
The LD5100 operates between100 - 240 VAC power. An AC power supply should be run to
the location of the unit. Before applying power to the unit, make sure the AC breaker switch is
turned off.
Once the power is turned off, strip the end of the AC supply so the three wires inside are
exposed. Strip the end of the line and neutral wires and feed the ends to the power supply
inside the LD5100 enclosure. The two power wires must now be inserted into the terminal
block in the lower right corner of the enclosure (Power Supply TB1). As indicated in the
enclosure, the line power wire is positioned on the center side of the terminal block (Line).
The neutral wire is placed into the opening on the left side of the terminal block (Neut). The
earth ground line is placed the right side of the terminal block (Gnd).
W
ARNING
Содержание LD5100
Страница 1: ...Leak Detection LD5100 User Guide...
Страница 8: ...970 484 6510 8 rletech com Notes...
Страница 10: ...970 484 6510 10 rletech com C Preventive Maintenance 65 D Troubleshooting 67 E Technical Specifications 71...
Страница 11: ...970 484 6510 11 rletech com...
Страница 12: ...970 484 6510 12 rletech com Notes...
Страница 14: ...970 484 6510 14 rletech com Notes...
Страница 24: ...www rletech com 24 970 484 6510 2 Connections and Settings Notes...
Страница 30: ...www rletech com 30 970 484 6510 4 4 20mA Output Testing Notes...
Страница 48: ...www rletech com 48 970 484 6510 7 EIA 232 Interface Notes...
Страница 60: ...www rletech com 60 970 484 6510 A Updating Firmware Notes...
Страница 66: ...www rletech com 66 970 484 6510 C Preventive Maintenance Notes...
Страница 70: ...www rletech com 70 970 484 6510 D Troubleshooting Notes...