BEFORE YOU START:
Read all instructions carefully
Identify all parts and check quantities against parts list
Select a level site
Do not mark cladding with pencil as lead can cause corrosion to cladding
During assembly, ensure all drill filings are removed between layers of steel, before riveting together
SAFETY:
Do not attempt to build your shed in high winds
Beware of sharp edges, recommend use of gloves
Protect your eyes and ears
For ease of assembly, use a friend to help
TOOLS REQUIRED:
WARRANTY REQUIREMENTS
:
Following are the minimum requirements for cladding used in Sentry Sheds.
Wash all surfaces annually using a hose and soft nylon brush.
Within 2 km of coast – wash every 3 months as above. After a storm, wash the cladding and the gutters as soon
as possible to remove any highly corrosive salt deposits.
Volcanic Ash Fallout – wash as soon as possible, removing fall out from roof and gutters.
Do not allow manures, chemicals or other corrosive materials to have direct contact with cladding
.
DRILL RIVETER
3.5 & 10 DRILL BIT
HAMMER
LADDER
TAPE MEASURE
PEN
NAIL PUNCH
CONGRATULATIONS ON PURCHASING A DURATUF SENTRY SHED.
BEFORE YOU BEGIN THE ASSEMBLY PLEASE NOTE SOME IMPORTANT POINTS
:
2
SQUARE DRILL BIT
Содержание Duratuf SENTRY SHEDS SG3030
Страница 1: ...ASSEMBLY INSTRUCTIONS SG3030 BASE SIZE 3 020m x 3 020m ...
Страница 2: ......
Страница 15: ......