background image

 

 

ASSEMBLY INSTRUCTIONS 

SG3030 

BASE SIZE: 3.020m x 3.020m 

Содержание Duratuf SENTRY SHEDS SG3030

Страница 1: ...ASSEMBLY INSTRUCTIONS SG3030 BASE SIZE 3 020m x 3 020m ...

Страница 2: ......

Страница 3: ...EQUIREMENTS Following are the minimum requirements for cladding used in Sentry Sheds Wash all surfaces annually using a hose and soft nylon brush Within 2 km of coast wash every 3 months as above After a storm wash the cladding and the gutters as soon as possible to remove any highly corrosive salt deposits Volcanic Ash Fallout wash as soon as possible removing fall out from roof and gutters Do no...

Страница 4: ... m 2 Roof 1 600 m 12 Weatherstrip 1 810 m 1 Door 3 4 Sheet 1 810 m 3 Barge 1 600 m 4 TIMBER Ridge Flashing 1 800 m 2 Bottom Plates H4 Green Front Back 3 020 m 2 Padbolt Support Front 0 140 m 1 Bottom Plates H4 Green Sides 3 020 m 2 Padbolt Support Back 0 070 m 2 Top Plate H1 Red Front Back 3 020 m 2 Spouting 3 055 m 2 Top Plate H1 Red Sides 3 020 m 2 HARDWARE Ridge Beam H1 140 x 45 3 020 m 1 Hardw...

Страница 5: ...te Side Back Wall Sheets Front Wall Sheets Door Jambs Front Wall Sheet Door Side Flashing Hinge Door Top Bottom Ridge Beam Jack Stud Ridge Flashings x 2 5 ASSEMBLE FRONT PANEL 6 ASSEMBLE WALLS 7 ASSEMBLE ROOF 8 SECURE SHED 4 ASSEMBLE BACK PANEL 3 ASSEMBLE SIDE PANELS 1 LAY FOUNDATION 2 ASSEMBLE DOORS QUICK OVERVIEW Barge Flashing Spouting Door Brace ...

Страница 6: ...ng through from underneath During construction you may raise the bottom timber plate to allow the wall cladding to protrude 20mm below the bottom plate This will stop water flowing between the bottom plate and the concrete floor See note on page 7 80mm 100mm 7 5mm 20mm Concrete Floor Base Plate Wall Cladding 5 RAISED BASE PLATE OPTION For sheds placed on a raised concrete floor No doubt by now you...

Страница 7: ... surface making sure narrow pans are on the outside Rivet sheets together ensuring ends are flush with each other STEP 2 Position door side flashings and 0 945m top and bottom flashings and assemble door as shown Drill and rivet as per diagram STEP 4 On the back of the door place door braces in posi tion as shown in fig 3 Ensure that the top and bottom ends of the braces are under the door flashin...

Страница 8: ...P 3 Nail wall sheets to the Top Plate at each end making sure that the top corners of the sheets are flush with the top of the Top Plate and that the sides of the wall sheet overhang the Top Plate by approx 15mm as shown Check that the Top Plate is straight then nail the Wall sheet to the Top Plate 2 clouts per pan see fig 1 Std Shed Bottom Plate will protrude below wall sheet by approximately 10m...

Страница 9: ...late using two clouts per pan STEP 4 Nail the wall sheets to the Bottom Plate at each end ensuring that each side of the wall sheets overhangs the Bottom Plate by 15mm and that the distance between the Top and Bottom Plates is correct As shown Check that the Bottom Plate is straight then nail wall sheets to the Bottom Plate using two clouts per pan Std Shed Bottom Plate will protrude below wall sh...

Страница 10: ...mb Flashing ensuring door closes properly Fit remaining rivets STEP 3 Place 3 x Wall Sheets on timber plates and rivet the sheets together as shown Ensure that the top of the sheet is flush with the top of the Top Plate and that the sides of the wall sheet overhang the Top Plate by 15mm as shown Nail wall sheets to Top Plate two clouts per pan Nail the wall sheets to the Bottom Plate making sure t...

Страница 11: ...ng someone to support the panels while they are screwed together Before fixing ensure that the Side Panel overlaps the Back Panel Using 4 x 40mm screws 2 per join screw the Top and Bottom Plates together in the corners STEP 2 Repeat Step 1 with the second Side Panel ensuring that the Side Panel overlaps the Back Wall Panel STEP 3 Stand up the Front Wall Panel Ensure that the Front Wall Sheets over...

Страница 12: ...Studs into the Timber Top Plate fig 2 Check that the shed is sitting level and square and that the diagonal Top Plate measurements are the same fig 1 JACK STUD TOP PLATE RIDGE BEAM fig 2 fig 3 15mm JACK STUD RIDGE BEAM TOP PLATE ROOF SHEET SIDE WALL FRONT WALL BACK WALL SIDE WALL TOP PLATE BOTTOM PLATE RIDGE BEAM SIDE WALL FRONT WALL BACK WALL SIDE WALL TOP PLATE BOTTOM PLATE STEP 2 Position the f...

Страница 13: ...TE STEP 3 Position 1 x roof sheet so that the top of the sheet is at the centre of the Ridge Beam and the side of the sheet over hangs the end of the Ridge Beam and the Top Plate by 15mm Ensure the Ridge Beam and the Top Plate are straight Nail 4 x corners of the Roof Sheet as shown ensuring the ribs on the Roof Sheet line up with the front Roof Sheet and the back Wall Sheet Nail off the first she...

Страница 14: ...l bit is required OPTIONAL SENTRY FLOOR Position the Floor Joists centrally between the side Base Plates and skew nail each end with two 75mm nails Check that the shed is sitting level and square and that the diagonal Bottom Plate measurements are the same Place the floor boards in position and nail securely 10 x 50mm nails per board IMPORTANT CLEAN UP REMOVE ALL DRILL FILINGS FROM ROOF WALLS AND ...

Страница 15: ......

Страница 16: ... less than 200g m2 as published by Branz Warranty certificate being returned to manufacturer within 21 days of purchase together with proof of purchase This warranty does not cover the following Fastenings and fixings Normal wear and tear damage by impact or acts of God Situations where the shed has been used for storage of chemicals manure or corrosion causing products Unauthorized modification o...

Отзывы: