Riverside Hydronics EPV SERIES Скачать руководство пользователя страница 17

EPV SERIES CONDENSING WATER BOILER 

 

34-501  07/13 

 

17

MAINTENANCE (con't) 
 

8. 

The need to periodically check water level controls and waterside of the pressure vessel cannot be over 
emphasized. Most instances of major boiler damage are the result of operating with low water or the use of 
untreated (or incorrectly treated) water.  

 

Every boiler is equipped with an electronic low water cutoff. This device senses continuity between a probe 
located in the top of the tank and the water to verify the presence of water. It is important to check the 
operation of this device periodically. 

 

9. 

This boiler may be equipped with a float-type low water cutoff. Since low water cutoff devices are generally set 
by the original manufacturer, no attempt should be made to adjust these controls to alter the point of low water 
cutoff. If a low water device should become erratic in operation or if it's setting changes from previous 
established levels, check for reasons and correct; repair or replace as required. 

 

The controls operation may be checked by stopping the water supply to the boiler while the burner is operating 
at low fire. While under constant attendance allow the water to lower at a normal rate. If a control does not 
break the circuit to stop the burner at the proper point, then 

SHUT DOWN THE BURNER IMMEDIATELY

 
Do not restart until all cross connecting piping is checked for obstructions. Also check the float bowl. If these 
are clean, repair or replace the control. Repeat the above test to insure proper operation prior to returning the 
boiler to service. 
 
Remove the pipe plugs from the tees and crosses and make certain the cross connecting piping is clean and 
free of obstructions. Controls must be mounted in a plumb position for proper performance.  
 
Determine piping is vertically aligned after shipment and installation and throughout the life of the equipment. 
The operation of the electronic low water cutoff may be checked in the same manner, by bypassing the 
function of the float low water cutoff. 

 

10. 

It is important to blowdown the float low water cutoff devices when supplied. It is recommended that a short 
blowdown be conducted daily. Float low water cutoffs should be equipped with test-n-check valves to allow 
blowdown of low water cutoff without requiring complete drainage of the boiler. 

 

11. 

A boiler used for heating or seasonal loads or for standby service may have an extended period of non-use. 
Special attention must be given so that neither waterside nor fireside surfaces are allowed to deteriorate from 
corrosion. 

 

There are two methods of storage – wet or dry. Your water consultant or feedwater treating company can 
recommend the better method, depending upon circumstances in a particular installation. Section VII of the 
ASME Code also contains information relating to laying up a boiler. 

 

12. 

Extended shutdown of the boiler and restarting are as follows: 

 

  Turn off all power and fuel supplies. 

  Enter boiler into dry storage. 

  Tag power switch(s) that fuel is off and tank is in storage condition. 

  Remove tank from storage and turn fuel and power switch(es) on to start. Reset all controls and  

conduct startup of the boiler as discusses previously. 

 

 
 
 
 
 
 
 
 
 

Содержание EPV SERIES

Страница 1: ...on adjustment alteration service or maintenance can cause property damage personal injury exposure to hazardous materials or loss of life Refer to the information contained in this manual A qualified...

Страница 2: ...oose fitting clothing eye protection and gloves FIRST AID MEASURES If any of the irritations listed persists seek medical attention Eyes Flush with water Skin Wash with soap and warm water Ingestion D...

Страница 3: ...THE PHYSICALLY HANDICAPPED HOSPITALS AND NURSING HOMES ELDER CARE FACILITIES AND REST HOMES ORPHANAGES AND CHILD CARE FACILITIES OTHER INSTALLATIONS WHERE RESPONSE TO CONTACT WITH HOT WATER MAY BE SLO...

Страница 4: ...ng control 5 I beam skid 17 Drip leg 6 Flue outlet 18 Electronic LWCO control 7 Gas inlet 19 Temperature pressure gauges 8 Induced draft blower motor 20 Alarm bell 9 Circulating pump 21 Differential a...

Страница 5: ...e CAN CSA B149 1 and or B149 2 and or local codes LOCATION 1 Locate the unit in a clean and dry area as close as possible to the greatest hot water usage and as near to gas oil steam boiler water and...

Страница 6: ...ed to the correct points 3 When remote on off or lead lag enable operation is used remove jumper from R1 and R2 and wire in series 4 A proper earth ground for this unit must be provided A single condu...

Страница 7: ...ision shall be made to drain off and dispose of condensate from a venting system A fitting no more than 18 from the combustion blower should be provided in the venting to route vent condensate away fr...

Страница 8: ...use the correct terminations could result in carbon monoxide poisoning causing personal injury or loss of life Air inlet duct is defined as a means of ducting the outside combustion air to the burner...

Страница 9: ...EPV SERIES CONDENSING WATER BOILER 34 501 07 13 9 Typical Termination Locations for Vertical Vent Pipes Termination of less than 10 feet Figure 501 2 Termination of more than 10 feet Figure 501 3...

Страница 10: ...eparation to prevent recirculation of combustion products Although the National Fuel Gas Code provides minimum clearances use sound engineering judgment considering prevailing winds obstructions and t...

Страница 11: ...ction Figure 501 6 1 Static fan 11 Manual shutoff valves 2 End cap 12 Main gas pressure regulator 3 Gas nozzle assembly 13 Main gas valve 4 Pressure plate 14 Pilot gas valve 5 Blast tube burner housin...

Страница 12: ...wo stage models a second operating thermostat is used to control the second stage operation and should be set approximately 10 F below the primary operator Adjustment may be made by turning the thermo...

Страница 13: ...at least thirty seconds 17 When the blower motor starts the air damper will open and the airflow proving light on the MEC120 should be on This indicates a positive airflow condition If the air proving...

Страница 14: ...fold gas pressure slightly and take readings until CO is within proper range Optimum reading is no CO 24 If manifold pressure was changed during startup take a final CO and O2 reading 25 Record CO2 an...

Страница 15: ...07 13 15 Record the following information for future use 1 Manifold gas pressure W C 2 Vent pressure W C 3 O2 reading 5 7 4 CO2 reading 8 9 5 CO reading ppm less than 300 ppm 6 NOx reading ppm 7 Vent...

Страница 16: ...R ANY REASON CONSULT THE FACTORY FOR INSTRUCTIONS 3 Examine the venting system at least monthly for proper connections alignment or the presence of corrosion If corrosion appears the boiler must not b...

Страница 17: ...est to insure proper operation prior to returning the boiler to service Remove the pipe plugs from the tees and crosses and make certain the cross connecting piping is clean and free of obstructions C...

Страница 18: ...he holes in the pressure plate 16 Inspect electrodes for cracked ceramic or loose retaining studs that hold the wire within the ceramic Select the proper pressure plate hole to place each electrode an...

Страница 19: ...N REPORT DATE BURNER INSPECTION COMBUSTION ANALYSIS TANK INSPECTION TANK FLUSH CLEANOUT TANK FITTING INSPECTION VENT INSPECTION THERMOST AT INPSECTION GAS TRAIN LEAK TEST Recommended Inspection Interv...

Страница 20: ...17 i Defective circulation pump Repair or replace j Regulator vent line s plugged Remove blockage 2 OCCASIONAL LOCKOUTS FOR NO APPARENT REASON a Gas pilot ignition failure Check to see that ignition i...

Страница 21: ...OTOR RUNS AND PILOT LIGHTS BUT THE MAIN GAS FLAME IS NOT ESTABLISHED a Main shutoff or test cock closed Check to make certain fully open b Pilot flame signal reading too low to pull in flame safeguard...

Страница 22: ...nsate for small line Do not raise pressure so high that under static no flow conditions the pressure exceeds the maximum allowable pressure to the gas train components on the burner f Automatic gas va...

Отзывы: