5 Commissioning
Rittal air/water heat exchanger assembly instructions
17
EN
4.8 Finalising assembly
4.8.1 Finalising the air/water heat exchanger
assembly
• Connect the connector to the rear of the display.
• Place the louvred grille onto the unit at the front,
and press it down until you hear it snap into place.
Fig. 16:
Connect the display and attach the louvred grille
5
Commissioning
• Once all the assembly and installation work is
complete, switch on the power supply and the
water supply to the air/water heat exchanger.
The air/water heat exchanger starts running:
– With Basic controller: The green operating LED
(“line”) is illuminated.
– With Comfort controller: The software version of the
controller first appears for approx. 2 seconds, then
the enclosure internal temperature appears in the
7-segment display.
You can now make your individual settings on the
unit, e.g. set the temperature or (with Comfort con-
troller only) assign the network identifier, etc. (refer to
the “Operation” chapter).
Содержание SK 3209. Series
Страница 2: ......