background image

MAINTENANCE
Curtain Replacement

Removal

1  At the basket post assembly 

(Figure 5)

:

•  Remove the crank (D) from the crank storage clip (A)
• 

Place the crank on worm shaft (C) to disengage 

worm from worm gear by back threading until free.

• 

Lock worm shaft (C) in place by pushing it toward 

the unit, the locking key (B) will engage and hold it 

in place

Rotate the entire basket assembly 90 degrees by 

releasing the locking key (H). The locking key will 

re‑engage and lock the basket in the horizontal 

position (I). The bumper (J) stops against the post 

(Figure 7).

3  At the latch post assembly remove the curtain tube 

handle from the upper hasp and lower hasp 

(Figure 6)

 

Place curtain on floor and remove any twists or folds 

that could impede returning the curtain to the storage 

basket

5  At the basket post assembly, place crank (D) on 

worm shaft (C) 

(Figure 5)

and roll the curtain into the 

basket

With the curtain completely stored inside the basket, 

rotate the basket assembly back to the vertical 

position by releasing the locking key The locking 

key will re‑engage and lock the basket in the vertical 

position Return the crank to the storage clip

   

BUMPER STOPS 

AGAINST POST

QUICK 

RELEASE 

PIN

(5) SCREWS FOR ROLLER ACCESS

BASKET ROTATION

 A

To access curtain, remove the (5) 1/4‑20 self 

threading screws (A) 

(Figure 9) 

from upward 

 

facing basket and remove shroud

NOTE:

Do not remove the rivets

 B

Unwind curtain from roller tube. After the curtain 

is completely unwound from roller tube, remove 

the 2 fasteners (B) that attach the curtain to the 

tube Detach touch and hold fastener

 

and remove 

remaining curtain end

Figure 9 

Figure 10 

SpanGuard

®

 Mesh Safety Barrier 

Installation/Service/Owner's Manual

 Rite‑Hite

®

8 Publication: 

AMEN00136 2019-11-22

Содержание SpanGuard

Страница 1: ...Concrete 5 OPERATION Extending Barrier 6 Storing Barrier 7 Changing Position 7 MAINTENANCE 7 Curtain Replacement 8 PARTS SpanGuard Complete Unit 10 Basket 11 Cylinder Curtain 12 Post 13 Roller Tube and Curtain 14 Drive 15 Crank 15 WARRANTY 16 Manual Part 54450049 Model SPANGUARD Publication AMEN00136 2019 11 22 SpanGuard Mesh Safety Barrier Installation Service Owner s Manual ...

Страница 2: ...51 7775252 6279276 8490668 7237591 8087443 8826963 and may be covered by additional pending U S and foreign patent applications Manufactured by Rite Hite Engineered Solutions Group Inc SAFETY Safety Identifications DANGER Indicates a hazardous situation which if not avoided will result in death or serious injury Indique une situation dangereuse qui si elle n est pas évitée peut entraîner la mort o...

Страница 3: ...lled Barricader la zone de travail jusqu à ce que l unité s ont été complètement installé Verify all components were received Notify your Rite Hite representative if parts are missing or damaged Required Tools Tape measure Hammer drill Hammer 3 4in 19mm x 8in 203 2mm concrete drill bit Impact wrench 150ft lbs with 1 1 8in impact socket Figure 1 Rite Hite Installation Service Owner s Manual SpanGua...

Страница 4: ...OTE SpanGuard can be used for exterior installations Deflection Offset Specifications SpanGuard Deflection Measured from strap KE Joules 30ft 9150mm clear opening width 60ft 18300mm clear opening width 200 17in 432mm 26in 660mm 400 18 5in 470mm 27 5in 699mm 600 20in 508mm 29in 737mm 800 21 5in 546mm 30 5in 775mm 950 23in 584mm 32in 813mm Figure 2 Figure 3 SpanGuard Mesh Safety Barrier Installation...

Страница 5: ...rs with the impact wrench Ma contact with the base plate Use compressed air to clean the drilled hole so you can tighten the anchor completely 3 Titan HD Concrete Anchor Installation In Tools Required Hammer Drill with x 8 Concrete Drill Bit Impact Wrench with 1 1 8 Impact Socket Installation Drill a Diameter hole in the concrete The hole should or completely through the concrete Using a drill bit...

Страница 6: ...d it in place 2 Grasp the curtain tube handle E and pull curtain from storage basket by walking across the opening to latch post assembly F 3 To latch the curtain tube handle to the latch post place the lower end of the curtain handle in the bottom hasp G1 and rotate the top hasp G2 up and over the top end of the curtain tube handle Ensure curtain tube handle is fully engaged in latch post 4 Retur...

Страница 7: ...n Return the crank to the storage clip Changing Position BUMPER STOPS AGAINST POST QUICK RELEASE PIN 5 SCREWS FOR ROLLER ACCESS A B C A Left hand operation position Right hand operation position All SpanGuards are assembled in a left hand operation position To determine position Stand facing the mounting post with the curtain storage basket between the post and yourself The worm shaft and bushing ...

Страница 8: ...ge basket 5 At the basket post assembly place crank D on worm shaft C Figure 5 and roll the curtain into the basket 6 With the curtain completely stored inside the basket rotate the basket assembly back to the vertical position by releasing the locking key The locking key will re engage and lock the basket in the vertical position Return the crank to the storage clip MPER STOPS AINST POST QUICK RE...

Страница 9: ...AR OPENING WIDTH Protected Area B 1 Position curtain on floor in front of basket so curtain stiffeners B are closest to the primary area being protected The curtain is always attached to the side of the roller tube nearest the basket entry slot A 2 Center curtain on tube and attach by applying pressure to touch and hold fastener Insert a tek screw into each curtain strap and the roller tube Once t...

Страница 10: ...2 60 Curtain Storage Cylinder w post 19750010 3 30 Curtain Storage Cylinder w post latches 19750011 3 60 Curtain Storage Cylinder w post latches 19750012 4 48 High Square Post Kit 65650018 5 Single Latching Post 65650017 6 Double Latching Post 65650019 SpanGuard Mesh Safety Barrier Installation Service Owner s Manual Rite Hite 10 Publication AMEN00136 2019 11 22 ...

Страница 11: ...MNT 52MM 7 4 1 BRG BALL 1ID X2OD 7 5 2 BLT CARG 5 16 18X1 Z5 8 5 NUT HEX NYL LOCK 5 16 18 ZNC 9 2 FLANGE BRG MNT 52MM 10 1 BRG BALL 1ID X2OD 11 5 BLT CARG 5 16 18X1 Z5 12 2 PLUG NYLON BLK 5 16 13 1 HNDL PHENOLIC FIXED 3 8 16X1 2 14 1 SCR RHMS PHLP 10 24X3 4 ZNC 15 1 CLIP GRIP SPRING 1 ZNC 16 2 PAD WEAR HOUSING SPANGUARD 17 1 PIN ANTI ROT BASKET SPNGRD 18 2 NUT HEX NYLCK 1 4 20 Z5 19 2 SCR HHMS 1 4...

Страница 12: ...0 SPNGRD 19750016 1 1 CURTAIN ASSY XX SPANGUARD 2 1 CRANK ASSY SPANGUARD 19600001 3 1 ROLLER ASSEMBLY SPANGUARD 67202001 4 1 KIT DRIVE ROLLER SPANGUARD 53760098 5 1 BASKET ASSY SPANGUARD 12440002 SpanGuard Mesh Safety Barrier Installation Service Owner s Manual Rite Hite 12 Publication AMEN00136 2019 11 22 ...

Страница 13: ...6 LABEL BARRIER POST SPNGRD 7 PLUG NYLON BLK 1 4 8 NUT HEX NYL LOCK 1 2 13 ZNC 9 WSHR FLAT 1 2X1 3 8X7 64 ZNC 10 SCR HHMS 1 2 13X5 5 Z5 11 PLUG PLSTC YLW 9 16 12 ANCHOR CONCRETE HH 3 4X7 ZINC 15 PIN ASSY QUICK RELEASE 64040031 1204A003 pdf 2 Rite Hite Installation Service Owner s Manual SpanGuard Mesh Safety Barrier Publication AMEN00136 2019 11 22 13 ...

Страница 14: ... Hold Fastener PSA HOOK BLK 2IN CURTAIN ASSY 30 SPANGUARD 28200052 CURTAIN ASSY 60 SPANGUARD 28200053 3 1 CURTAIN SEWN SPANGUARD XX 4 1 HNDL PULL CURT SPANGUARD 5 2 PLUG PLSTC BLK 7 8 RBD 6 2 RVT POP LF BLK 3 16X3 8 7 2 SCR HWH DR TP 1 4 14X1 1 4 SpanGuard Mesh Safety Barrier Installation Service Owner s Manual Rite Hite 14 Publication AMEN00136 2019 11 22 ...

Страница 15: ... LOCK SPLIT 3 8 ZNC 10 2 SCR HHMS 3 8 16X2 1 2 Z5 11 1 KEY LOCKING SPANGUARD 12 1 SHROUD GEAR SPANGUARD Crank 1204A003 pdf 6 QTY DESCRIPTION PART CRANK ASSY SPANGUARD 19600001 13 1 HNDL STEEL SWIVEL 3 8 16X4 ZNC 14 1 LEVER WLDMNT CRANK SPANGUARD 15 1 NUT HEX NYLCK 3 8 16 Z5 16 1 SCR RHMS PHLP 10 24X3 4 ZNC 17 1 NUT HEX NYL LOCK 10 24 ZNC 18 2 WSHR FLAT 1 4X3 4X1 16 ZNC 19 1 MAG RND 14LB 1 3 8OD 3 ...

Страница 16: ...aintenance or normal wear and tear of the Product iii failure to follow Rite Hite s instructions for installation failure to operate the Product within the Product s rated capacities and or specified design parameters or failure to properly maintain the Product iv use of the Product in a manner that is inconsistent with Rite Hite s guidelines or local building codes v movement settling distortion ...

Отзывы: