Publication:
AMEN00395 2020-07-06
7
HEADER GUIDE INSTALLATION
1. Locate the header and position in front of the
machine. Determine drive and non-drive side,
Figure 5.1.
2. Locate the drive (shorter w/2 loops) belt and fasten
to the drive side of the header by removing the
center pin on the bolt, looping belt through and
tightening nut.
3. Locate the idle (longer) belt (K) and route through
the header so 2’ [610] hangs out the drive side and
the rest out the non-drive side under the idle pulley
(L).
NOTE: To ease belting installation, elevate one end
of the header so the belt slides downhill.
4. Set blocks (N) onto the curtain container frame so
the header can rest on them,
Figure 5.2.
5. Install idle belt attachment bracket to the inside at
the top of the non-drive header guide and fasten the
idle belting to the bracket. Make sure belting is tight
and not twisted,
Figure 6.4.
6. Optional Reversing Edge (M).
OPTIONAL INTERRUPT SWITCH
PLACEMENT
NOTE: The interrupt switch is a cam style switch. It
is at the top of the non-drive curtain guide.
1. Place the curtain in the up position.
2. Adjust position of switch in curtain guide until switch
is aligned with the curtain,
Figure 5.4.
3. Secure switch assembly.
4. Wire switch directly into the control circuit,
Page 12.
PUB. NO. FLSFLDG SEPTEMBER 2015
7
FLASHFOLD
™
MODEL FLSFLD
CHAPTER 2 - HEADER INSTALLATION
Fr
ame
and
Header
Installa
tion
Figure 5.3
Figure 5.2
Figure 5.1
Figure 5.4
N
M
L
K
K