Pub. No. 1190 — May 2014
13
RITE-HITE
®
VBR-500 DOK-LOK
®
Owner’s Manual
NOTE:
If a leveler is installed at the VBR-500 DOK-
LOK vehicle restraint location, it may be
necessary to raise the leveler before performing
maintenance. Raise the leveler, insert
and secure the SAFE-T-STRUT, and
LOCKOUT/ TAGOUT the power source.
NOTE:
Your local RITE-HITE
®
representative provides a
Planned Maintenance Program (P.M.P.) which
can be fitted to your specific operation. Call
your local representative.
DAILY
1. Remove debris around the VBR-500 DOK-LOK
vehicle restraint pit and from loading dock face.
2. Verify inside and outside lights are working.
3. Replace damaged or missing light bulbs and lenses.
4. Repair, remount, or replace outside and inside signs
as required.
5. Inspect dock bumpers. Missing bumpers must be
replaced.
180 DAYS
1. Perform all Daily maintenance.
2. Inspect hydraulic hoses and power unit.
3 Check oil fluid level.
4. Inspect pit junction and light box. They should be
rigidly mounted. If loose or damaged, inspect all
wires and wire connections.
5. Inspect switch wires from VBR-500 DOK-LOK
vehicle restraint to junction box. Look for kinks,
crushed areas, etc.
6. Perform operational test after all maintenance
repairs and adjustments are complete.
7. Inspect dock bumpers. Four inches (4") of protection
is required. Worn, torn, loose or missing bumpers
must be replaced.
MAINTENANCE
A safe work place requires all lights and the horn
to be working properly. DO NOT use DOK-LOK
vehicle restraint if parts are broken or missing.
When working with electrical or electronic
controls, make sure that the power source has
been locked out and tagged according to OSHA
regulations and approved local electrical codes.
Post safety warnings and barricade work area, at
dock level and at ground level, to prevent
unauthorized use of the dock pition.
Maintenance may be required more frequently at
loading docks exposed to harsh environments
(extreme climates, corrosive chemicals,
frequency of usage, etc.). Consult RITE-HITE if
these conditions exist for accelerated
maintenance requirements.