11
RS/03-GT-016-2019
Date: 2021-02-01
Use a suitable lifting fixture to handle, no more than 2
pallets of modules. Before lifting, check whether the
tray and the carton are damaged and whether the
hoisting ropes are strong and firm. Two people shall
support at the two sides of the righting carton gently to
place it on the relatively flat position of the project site
Use a forklift to remove the unit from the truck.
During loading or unloading, the forklift must not hit the
packing box.
Place the modules on a level surface.
The stacking of modules at the project site is
prohibited