RS/03-GT-016-2019

Date: 2021-02-01

Use a suitable lifting fixture to handle, no more than 2

pallets of modules. Before lifting, check whether the

tray and the carton are damaged and whether the

hoisting ropes are strong and firm. Two people shall

support at the two sides of the righting carton gently to

place it on the relatively flat position of the project site

Use a forklift to remove the unit from the truck.

During loading or unloading, the forklift must not hit the

packing box.

Place the modules on a level surface.

The stacking of modules at the project site is

prohibited

Содержание RSM120-6- BMDG Series

Страница 1: ...MAINTENANCE MANUAL DOCUMENT NO RS 03 MR 01 2021 COMPILER Chen shuilin EDITION A 0 2021 REVIEWER Zhang Shengcheng DISTRIBUTION NO APPROVER Liu Yafeng STATUS STAMP THIS DOCUMENT HAS A TOTAL OF 34 PAGES...

Страница 2: ...dd force requirements for the installation of connectors add RSM144 6 frame 25mm module load Pei Shichao 2020 11 A 3 2020 Chapter 1 7 8 Delete some PV module models update the requirements for seaside...

Страница 3: ...the installation system and Risen has the right to refuse to compensate for the damage of the modules caused by the operation reasons or design defects of the power generation system 2 SCOPE This docu...

Страница 4: ...selection 14 7 2 Tilt angle of Installation 16 7 3 Installation requirements for bifacial module 17 8 Installation Guidelines 18 8 1 Bolting method 18 8 1 1 Bolts installation 18 8 1 2 Fixture install...

Страница 5: ...areas home power systems renewable energy vehicles hydropower stations water pumps communication system or constitute solar photovoltaic power station directly These systems not only can be used by b...

Страница 6: ...ls should be followed in the meantime all the requirements defined by local law authority agency or government should be followed Failed to follow this manual or the above rules law will cause the fai...

Страница 7: ...he module at any time When open the packing box please use the professional and proper tools which can avoid the inclining and dropping of the module It is forbidden to put the module in a place witho...

Страница 8: ...by damaged module please do NOT wear metal objects such as ring watch ear ring and nose ring in the term of the installation and maintenance Do NOT disconnect any electrical connections or unplug any...

Страница 9: ...re UL1703 is required it must comply with the requirements of the U S National Electrical Code or it will be considered a violation of UL1703 Please consult with local authorities for the requirements...

Страница 10: ...5 Unloading Transportation and Storage 5 1 Markers on outer packaging 5 2 Unloading cautions Discarded at will of the module is forbidden and require special recycling Modules shall be kept dry NOT e...

Страница 11: ...the hoisting ropes are strong and firm Two people shall support at the two sides of the righting carton gently to place it on the relatively flat position of the project site Use a forklift to remove...

Страница 12: ...long term storage Packaged products can be shipped by land sea or air During transportation please fix the packing box on the transport platform to ensure that the packing will not roll over No more...

Страница 13: ...e than 1 layers moisture 85 RH temperature in the range from 40 C to 50 C see Fig 5 1 Fig 5 1 temporary storage at site warehouse 5 5 Markings on module Three markings are attached on the module with...

Страница 14: ...carton will incline which may cause damage or injury to personnel If there is wind at site it is necessary to pay special attention to safety especially in strong wind conditions and it is NOT recomme...

Страница 15: ...e can be installed or not For most places Risen solar PV modules should be installed where the sunlight can be maximally acquired throughout the year In the Northern hemisphere the light receiving sur...

Страница 16: ...solar modules this mismatch will cause the PV system power output loss The largest power will be generated When direct sunlight on solar PV module For modules which are installed on the fixed brackets...

Страница 17: ...himney and tree etc and even the partially shading such as the dirt snow and aerial wire etc should be avoided The generation gain is related to the ground reflectivity the module installation height...

Страница 18: ...lation and heat dissipation The minimum clearance between module frame and wall or roof should be ensure 115 mm at least The module frame has the effect of thermal expansion and cold contraction the m...

Страница 19: ...range 16N m 20 N m 14N m 18 N m 8 1 2 Fixture installation The Risen PV module can also be installed with clamp The PV module shall be fixed on the mounting bracket with M8 bolts and clamp It is stri...

Страница 20: ...ube Table 8 3 Photovoltaic module connector accessories Procedure Method Explanatory Chart 1 After unplugging the photovoltaic connector take either end and cover the cold shrinkable tube to the conne...

Страница 21: ...ble pipe 1 Before installation make sure that there is no sand water sharp objects and other sundries inside the cold shrinkable tube 2 It is forbidden to tie the label on the shrink tube to prevent t...

Страница 22: ...with cross beam A4 outer 4 holes installation without cross beam B1 inner 4 holes installation without cross beam B2 8holes installation without cross beam B3 Clamp installation without cross beam B4...

Страница 23: ...600 RSM144 6 xxxMB 2400 5400 2400 5400 2400 5400 2400 1600 1600 RSM60 6 xxxP MDG 2400 5400 2400 5400 2400 5400 2400 2400 2400 RSM72 6 xxxP MDG 2400 5400 2400 5400 2400 5400 2400 2400 2400 RSM120 6 xxx...

Страница 24: ...SM72 6 xxxBHDG 2400 5400 2400 5400 2400 5400 2400 2400 3600 2400 3600 2400 3600 2400 2400 2400 RSM120 6 xxxBHDG 2400 5400 2400 5400 2400 5400 2400 2400 3600 2400 3600 2400 3600 2400 2400 2400 RSM132 6...

Страница 25: ...3000 1800 2400 RSM144 6 xxxBHDG 2400 3000 1800 2400 RSM144 7 xxxBMDG 2400 3000 1800 2400 RSM150 8 xxxBMDG 2400 3000 1800 2400 RSM156 6 xxxBHDG 2400 3000 1800 2400 RSM144 9 xxxBMDG 2400 3000 1200 1200...

Страница 26: ...J Box at module middle position for vertical direction Extension cable Extension cable Extension cable Extension cable Fig 9 3 Split J Box at module middle position for horizontal direction Precautio...

Страница 27: ...he local policies laws and regulations PV modules can obtain different current and voltage outputs through series connection and parallel connection Read this installation manual carefully before elec...

Страница 28: ...the solar PV module changes with the temperature Considering the voltage increase caused by temperature drop in extreme environment in winter the maximum series connection number of solar PV modules...

Страница 29: ...Voc as defined in TUV 2PfG1169 or EN50618 H1Z2Z2 K Risen requires all cables and electrical connections to comply with the electrical regulations of the countries where the PV system is installed When...

Страница 30: ...odules together using the appropriate grounding conductor The grounding wire may be copper copper alloy or other materials that can be used as conductors and meet the requirements of the national elec...

Страница 31: ...ts of all the above grounding methods should penetrate the anodized film of the aluminum frame Risen modules can be grounded by other grounding devices which must be reliable and certified The manufac...

Страница 32: ...who have received professional PV system maintenance training and obtained relevant qualifications and authorization 12 1 PV Module Recycling Model Series STC 1000W m2 AM1 5 Cell Temp 25 NMOT 800W m2...

Страница 33: ...e terminals cannot be connected well Replace failed PV modules with same type Do not touch live wires and connectors directly When you need to touch them use suitable safety devices insulation tools g...

Страница 34: ...water do not use corrosive solvents and do not wipe the PV modules with hard objects When the pressure water is used the water pressure on the glass surface of the module must not exceed 700 KPa The...

Страница 35: ...ge any modules of the modules If electrical or mechanical properties are required for inspection or maintenance qualified professionals should be advised to avoid any electric shock or loss of life 15...

Страница 36: ...36 RS 03 GT 016 2019 Date 2021 02 01 English versions of this Manual the Chinese version shall prevail Risen reserves the rights to interpret this Manual...

Отзывы: