GR1-TM
- 17
GR1-TM
English
14
MAINTENANCE AND OPERATION MANUAL FOR GR1 GATE
2. Assembly of devices
DEVICES TRANSPORTATION TO AN ASSEMBLY SITE
MARKING THE ASSEMBLY ZONE
In case of a larger number of devices, it is advised to transport
devices on pallets.
DEVICES TRANSPORT WITHOUT PALLETS
UNLOCKING THE HOUSING WITH A KEY
To carry the devices at short distances, one shall meet the OSH
regulations on loads.
Unlocking the housing needs to be done by turning a key (1) in
a lock (2). Note: keys must be removed from the lock after its
unlocking. To stabilize the gate it should be leant against
something e.g. a wall.
REMOVING THE DEVICE HOUSING
MAKING ASSEMBLY HOLES
Lift the housing (1) up.
Make assembly holes (1) in the foundation.