background image

8 | 

P a g e

 

 

1.5.3

 

Call 811. 

811 is the 

national call-before-you-dig phone number

. Anyone 

who plans to dig should call 811 or go to their state 811 

center's website before digging to request that the 

approximate location of buried utilities be marked with paint 

or flags so that you don't unintentionally dig into an 

underground utility line. 
Consult with your local building permit office and obtain any 

required building permits and formal information related to 

required footing depth and diameter for your locality. 

1.5.4

 

Install the Post-in-Ground footing 
system. 

1.

 

Excavate the required hole diameter and depth. Dig 

down an additional 6” in depth.  

2.

 

Fill the bottom 6” with loose gravel. The loose gravel 

will help keep water from pooling at the bottom of 

the post and will prevent rotting of the post bottom. 

3.

 

Set each post on top of the gravel. Level each post. 

Support the post using cross 2x4 members or other 

means. 

4.

 

Use a laser level to see if the post heights vary 

among all posts. All posts top should be on the same 

plane. If a post is too low, add more gravel under the 

post to lift the post up. If a post is too high, remove 

some gravel and lower the post.  

5.

 

Once all posts are level and all posts’ top surfaces 

are on the same plane, pour the concrete around the post. 

6.

 

Work in 6” incremental depths. Tap concrete with the tip of 

a trowel to remove air bubbles. Work upward until you 

reach ground level or 1” below ground level, depending on  

your desired final finish appearance. You may stop 1” below 

the surface so you can over fill with some dirt and plant 

grass around the post or you may fill all the way up to 

ground level.  

7.

 

At this point, create downward tapered profile moving away 

from the post in all directions on the concrete top surface. 

This taper will help water flow away from the post. 

8.

 

Wait 7 days for the concrete footing to cure before 

proceeding with the remaining construction work. If quick-

setting concrete is used, cure times may be shorter; read 

the information on the concrete bag or ask your concrete 

supplier. 

 

 

 

Содержание 6P-WSC

Страница 1: ...ding pergolas only and are not to be used for other structure construction purposes Thoughtfully engineered Brackets eliminate all wood joinery skills requirements Skills required footing post install...

Страница 2: ...Lag Screw Type Wood Type Pilot hole drill diameter and hole depth X 1 1 4 Lag Screw McMasterCarr com SKU 92351A546 Soft Wood 3 32 drill bit diam 1 1 4 depth Hard Wood 3 16 drill bit diam 1 1 4 depth...

Страница 3: ...approvals from the local building inspection department or the local authority over building codes 1 1 2 Other Cautions CAUTION Adhere to all safety requirements Wear safety glasses goggles when work...

Страница 4: ...rive lag screws into Pergola lumber members All pergola types 7 16 Hex Socket Drive X 1 1 4 Hex Hd lag screws All pergola types 9 16 Hex Socket Drive 3 8 X 3 Hex Hd lag screws Raftered pergola single...

Страница 5: ...to your problem Item SKU Description Item Qty Item Image 6x6 Post Top Floor 2 way Elbow Bracket SKU 6C2L 2 6x6 Wall Mount Bracket SKU 6WM 2 x 1 1 4 Lag Screw 32 1 4 LIST OF MATERIALS THAT YOU WILL SU...

Страница 6: ...ximum depth of the frost line for a particular area The diameter of the footing is determined by the weight each post applies to the footing If you add rafters a swing or hammock you must consider the...

Страница 7: ...r pergola systems to eliminate the need to cut any 6x6 post or header members Plan accordingly to minimize your work requirements The length of the headers you select will determine the final size and...

Страница 8: ...4 Use a laser level to see if the post heights vary among all posts All posts top should be on the same plane If a post is too low add more gravel under the post to lift the post up If a post is too...

Страница 9: ...es the side elevation profile for this pergola system POST HEIGHT DIM A DIM B 96 96 90 5 108 108 102 5 120 120 114 5 132 132 126 5 144 144 138 5 Dim A above is the height of the post used Dim B is the...

Страница 10: ...Details 1 Slide the 2 way elbow bracket s tube over the 6x6 post top after aligning the header receiver u channels in the proper direction Let gravity work and pull the bracket all the way down on to...

Страница 11: ...as a hole depth indicator when you drill each pilot hole Pilot holes should be drilled at least 1 1 4 deep A little bit deeper is acceptable but do not drill less than the required 1 1 4 depth 4 Dril...

Страница 12: ...Drive one x 1 1 4 Hex Lag Screw through each 5 16 hole into the pilot holes you drilled in step 4 using a 7 16 Socket and Rachet driver Tighten down each screw 6 Repeat steps 1 through 5 for each post...

Страница 13: ...eader into the U channels of adjacent post top bracket 2 Locate the two 5 16 holes on each vertical face of the U channels holding the 6x6 header Drill 3 32 X 1 1 4 deep pilot holes at the center of f...

Страница 14: ...14 P a g e 3 Drive one x 1 1 4 Hex Lag Screw through each 5 16 hole into the pilot holes you drilled in step 8 using a 7 16 Socket and Rachet driver Tighten down each screw...

Страница 15: ...ark a horizontal line which will align with the wall mount bracket s U channel bottom surface and mark a vertical line which will align with one vertical face of the wall mount bracket s U channel 2 T...

Страница 16: ...g e 3 Mount the wall mount brackets to the wall using appropriate fasteners 4 Lift and place a proper length header in the U channels in the post top 2 way elbow bracket and the adjacent wall mount b...

Страница 17: ...nter of all 5 16 diameter holes which are predrilled in the side faces of the U channels in the post top 2 way elbow bracket and the wall mount bracket 6 Drive x 1 1 4 Lag Screw through all pilot hole...

Страница 18: ...construction project went for you Was it easy to do Did parts fit easily and properly Do you like the quality of our products and design styles Is your pergola structure sturdy and strong Please go t...

Страница 19: ...for evaluation Incomplete claims may be rejected All pergola brackets must be installed according to all manufacturers instructions as per the installation instruction manual by a RioOutdoors com All...

Страница 20: ...ANY INCIDENTAL OR CONSEQUENTIAL COMMERCIAL DAMAGES OR DAMAGES TO PROPERTY TO THE EXTENT PERMITTED BY APPLICABLE LAW RioOutdoors com MAKES NO EXPRESS WARRANTIES OTHER THAN THE WARRANTY SPECIFIED HEREI...

Отзывы: