background image

15 | 

P a g e

 

 

1.9

 

WALL MOUNT BRACKET AND HEADERS INSTALLATION 

The horizontal distance between the two wall mount brackets will be equal to DIM A (See Section 1.5.2) that you decided 

upon. 

The vertical distance from the ground level up to the bracket must be measured and determined after you have installed the 

post-top 2-way elbow brackets. The bottom surface of the wall mount bracket should be level with bottom surface of the U-

channel which will receive the header running from the post-top 2-way elbow bracket to the wall mount bracket.  

1.

 

Mark the location of both wall mount brackets on the wall. Mark a horizontal line which will align with the wall mount 

bracket’s U-channel bottom surface and mark a vertical line which will align with one vertical face of the wall mount 

bracket’s U-channel. 

2.

 

The type of wall material will determine the type of fastener you must use to attach the wall mount bracket to the wall. 

For walls with siding on top of plywood sheathing, consider an expandable toggle anchor. For masonry walls, consider 

using a steel stud anchor for concrete. Note that the mounting holes in the wall mount bracket are 7/16” diameter and 

are designed to use a 3/8” diameter bolts. Use an appropriately sized anchor solution. 

 

 

Expandable toggle anchor 

McMastercarr.com SKU #97121A059 

or another alternative 

Steel stud anchor for concrete 

McMasterCarr.com SKU #92188A200 

or another alternative 

 

 

Содержание 6P-WSC

Страница 1: ...ding pergolas only and are not to be used for other structure construction purposes Thoughtfully engineered Brackets eliminate all wood joinery skills requirements Skills required footing post install...

Страница 2: ...Lag Screw Type Wood Type Pilot hole drill diameter and hole depth X 1 1 4 Lag Screw McMasterCarr com SKU 92351A546 Soft Wood 3 32 drill bit diam 1 1 4 depth Hard Wood 3 16 drill bit diam 1 1 4 depth...

Страница 3: ...approvals from the local building inspection department or the local authority over building codes 1 1 2 Other Cautions CAUTION Adhere to all safety requirements Wear safety glasses goggles when work...

Страница 4: ...rive lag screws into Pergola lumber members All pergola types 7 16 Hex Socket Drive X 1 1 4 Hex Hd lag screws All pergola types 9 16 Hex Socket Drive 3 8 X 3 Hex Hd lag screws Raftered pergola single...

Страница 5: ...to your problem Item SKU Description Item Qty Item Image 6x6 Post Top Floor 2 way Elbow Bracket SKU 6C2L 2 6x6 Wall Mount Bracket SKU 6WM 2 x 1 1 4 Lag Screw 32 1 4 LIST OF MATERIALS THAT YOU WILL SU...

Страница 6: ...ximum depth of the frost line for a particular area The diameter of the footing is determined by the weight each post applies to the footing If you add rafters a swing or hammock you must consider the...

Страница 7: ...r pergola systems to eliminate the need to cut any 6x6 post or header members Plan accordingly to minimize your work requirements The length of the headers you select will determine the final size and...

Страница 8: ...4 Use a laser level to see if the post heights vary among all posts All posts top should be on the same plane If a post is too low add more gravel under the post to lift the post up If a post is too...

Страница 9: ...es the side elevation profile for this pergola system POST HEIGHT DIM A DIM B 96 96 90 5 108 108 102 5 120 120 114 5 132 132 126 5 144 144 138 5 Dim A above is the height of the post used Dim B is the...

Страница 10: ...Details 1 Slide the 2 way elbow bracket s tube over the 6x6 post top after aligning the header receiver u channels in the proper direction Let gravity work and pull the bracket all the way down on to...

Страница 11: ...as a hole depth indicator when you drill each pilot hole Pilot holes should be drilled at least 1 1 4 deep A little bit deeper is acceptable but do not drill less than the required 1 1 4 depth 4 Dril...

Страница 12: ...Drive one x 1 1 4 Hex Lag Screw through each 5 16 hole into the pilot holes you drilled in step 4 using a 7 16 Socket and Rachet driver Tighten down each screw 6 Repeat steps 1 through 5 for each post...

Страница 13: ...eader into the U channels of adjacent post top bracket 2 Locate the two 5 16 holes on each vertical face of the U channels holding the 6x6 header Drill 3 32 X 1 1 4 deep pilot holes at the center of f...

Страница 14: ...14 P a g e 3 Drive one x 1 1 4 Hex Lag Screw through each 5 16 hole into the pilot holes you drilled in step 8 using a 7 16 Socket and Rachet driver Tighten down each screw...

Страница 15: ...ark a horizontal line which will align with the wall mount bracket s U channel bottom surface and mark a vertical line which will align with one vertical face of the wall mount bracket s U channel 2 T...

Страница 16: ...g e 3 Mount the wall mount brackets to the wall using appropriate fasteners 4 Lift and place a proper length header in the U channels in the post top 2 way elbow bracket and the adjacent wall mount b...

Страница 17: ...nter of all 5 16 diameter holes which are predrilled in the side faces of the U channels in the post top 2 way elbow bracket and the wall mount bracket 6 Drive x 1 1 4 Lag Screw through all pilot hole...

Страница 18: ...construction project went for you Was it easy to do Did parts fit easily and properly Do you like the quality of our products and design styles Is your pergola structure sturdy and strong Please go t...

Страница 19: ...for evaluation Incomplete claims may be rejected All pergola brackets must be installed according to all manufacturers instructions as per the installation instruction manual by a RioOutdoors com All...

Страница 20: ...ANY INCIDENTAL OR CONSEQUENTIAL COMMERCIAL DAMAGES OR DAMAGES TO PROPERTY TO THE EXTENT PERMITTED BY APPLICABLE LAW RioOutdoors com MAKES NO EXPRESS WARRANTIES OTHER THAN THE WARRANTY SPECIFIED HEREI...

Отзывы: