
Rinnai
7
ORH OIM
GENERAL DESIGN LAYOUT / CARTON CONTENTS
The packaging for this appliance should contain:
1.
Outdoor Radiant Heater:
a.
Heater body
b.
Front radiating surface.
2.
1000mm Flexible power cord with three pin plug
3.
Operation Indicator Light
4.
Adjustable angle mounting bracket
(x2)
5.
Mounting bracket locking plates (x2)
6.
Operating & Installation Instructions
OPERATION
1. Before operating the heater for the
time or after periods of non use ensure that the radiating surface is
clean and free of debris or dust see "Cleaning" on page 12.
2. Ensure that the GPO for the heater is in the "ON" position, then switch "ON" the power at the isolating switch
(if
3. The orange operation indicator will light to indicate the heater is on and the heater will begin to radiate infrared
heat.
NOTE
The heater may take up to 15 minutes to reach maximum heat, depending on the area being
heated and the conditions.
4. Switch "OFF" the power at the isolating switch to turn off the heater. The operation indicator will go out.
NOTE
The heater may take up to 30 minutes to fully cool down, depending on the area being heated and
the conditions.
4
5
1b
2
3
5
6
1a
4
ABOUT YOUR OUTDOOR RADIANT HEATER