background image

Rinnai 22 

I Series Evap AC IM

IMPORTANT

Switch OFF the power and unplug the Cooler before touching any wiring. Care shall be taken to 

ensure electrical components have been isolated before performing any service work, i.e. water 

inlet valve.

Only an electrically qualified technician should carry out any service to electrical wiring.

ISOLATING SWITCH: The Rinnai I Series cooler has a power-isolating switch to facilitate servicing 

and is located on the side of the Evaporator Module control panel. Always test for electrical 

voltage before commencing any work on the cooler.

9.1 TANK WILL NOT FILL WITH WATER

Check:

• 

For power at the solenoid valve when the tank should be filling.

• 

If  there  is  power  to  the  solenoid  the Aquastop  may  be  locked,  preventing  the  flow  of  water  through  to  the 

solenoid� If Aquastop is locked you will need to:

1�  Isolate the bi-directional gate vale�
2�  Remove supply line from the unit at the Aquastop�
3�  Bleed all remaining air from the supply line into the safety tray�
4�  Reconnect supply line to the unit�
5�  With power to the solenoid slowly open the bi-directional gate valve�

• 

The 10 Amp fuse in the meter box has not blown�

• 

The Cooler’s 3-pin supply plug is correctly located in the power socket�

• 

For power at the power socket (plug in another appliance and test)�

• 

The isolating switches at the unit and the supply power socket are turned ON�

• 

The unit is turned ON at the Wall Control�

• 

Call Rinnai for service�

9.2 FAN MOTOR WILL NOT START

Check:

• 

The 10 Amp fuse in the meter box has not blown�

• 

The Cooler’s 3-pin supply plug is correctly located in the power socket�

• 

For power at the power socket (plug in another appliance and test)�

• 

The isolating switches at the unit and the supply power socket are turned ON�

• 

The unit is turned ON at the Wall Control�

• 

The fans spin freely with adequate tip clearance�

• 

The quick-connect for the motor loom is not disconnected�

• 

That all other electrical connections are secure, and if the motor will not start, call Rinnai for service�

9.3 THE CIRCULATION PUMP WILL NOT START

Check:

• 

The 10 Amp fuse in the meter box has not blown�

• 

The Cooler’s 3-pin supply plug is correctly located in the power socket�

• 

For power at the power socket (plug in another appliance and test)�

• 

The isolating switches at the unit and the supply power socket are turned ON�

• 

The unit is turned ON at the Wall Control�

• 

The pump impeller is not blocked or obstructed�

• 

All electrical connections are secure, and if the pump will not start, call Rinnai for service�

9. TROUBLESHOOTING

Содержание I Series

Страница 1: ...ations and Municipal Building Codes including local OH S requirements This appliance must be installed maintained and removed by an Authorised Person For continued safety of this appliance it must be installed and maintained in accordance with the manufacturers instructions Installation Manual I Series Evaporative Air Coolers ...

Страница 2: ...rvice Clearances 9 3 Cooler Service Requirements 10 3 1 Electrical Power Supply to the Cooler 10 3 2 Water Supply to the Cooler 10 4 Cooler Hardware 11 4 1 Evaporator Module 11 4 2 Ventilation Fresh Air Intake 11 4 3 Fix and Seal the roof flashing 11 4 4 Rinnai I Series Eave Vent Installation 11 5 Evaporator Module Installation 12 5 1 Prior To Installation 12 5 2 Service Light Access Walkway 12 5 ...

Страница 3: ...et 20 7 3 Tank Water Quality and Replenishment during operation 20 7 4 Shut down Times 20 8 Commissioning Checklist 21 8 1 Installation Check Test 21 8 2 Other Commissioning Checks To Consider 21 9 Troubleshooting 22 9 1 Tank Will Not Fill With Water 22 9 2 Fan Motor Will Not Start 22 9 3 The circulation pump will not start 22 10 Ventilation Specifications 23 10 1 Exhaust Ventilation 23 10 2 Techn...

Страница 4: ...Rinnai 4 I Series Evap AC IM This page intentionally blank ...

Страница 5: ...lations and standards and that the products recommended to customers are fit for the purpose for which they are intended WARNING REGULATORY INSTALLATION This appliance shall be installed in accordance with Manufacturer s Installation Instructions Current AS NZS 3000 electrical codes Local Regulations and Municipal Building Codes including local OH S requirements Local water authority regulations D...

Страница 6: ...r involved in accessing cooler installations will not be accepted by Rinnai Avoid positioning the cooler near any source of smoke dust or objectionable fumes so that only fresh outside air will be drawn into it Coolers should not be sited close to the windows or bedrooms of neighbouring houses The cooler shall not be installed within a 5m 6m in WA radius of a sanitary vent 1 5m radius from a gas a...

Страница 7: ...TE An Roof Cap or Rinnai I Series Eave Vents can be supplied upon request to meet air intake requirements The I20 and I10 models require a minimum of eight 8 and four 4 Rinnai I Series Eave Vents respectively Other equivalent air intake accessories may be supplied by the installer refer to 4 Cooler Hardware on page 11 for further details QOHW 0HVK RQWURO 3DQHO RROLQJ SDGV KDPEHU 7RS KDPEHU 6LGH DQ...

Страница 8: ...ODEL I20 PLATFORM SERVICE CLEARANCES NOTE A minimum of 250mm is from any point on the Evaporator Module to the rafter LPHQVLRQ PP 5LQQDL 6HULHV 0RGHO 6DIHW 7UD 6DIHW 7UD 5DIWHU 0LQ 0LQ 0LQ 0LQ 0LQ 0LQ 0LQLPXP 3ODWIRUP 6HUYLFH OHDUDQFHV 2 DIMENSIONS SERVICE CLEARANCES ...

Страница 9: ...ERVICE CLEARANCES NOTE A minimum of 250mm is from any point on the Evaporator Module to the rafter LPHQVLRQ PP 5LQQDL 6HULHV 0RGHO 6DIHW 7UD 6DIHW 7UD 0LQLPXP 3ODWIRUP 6HUYLFH OHDUDQFHV 0LQ 0LQ 0LQ 0LQ 0LQ 6DIHW 7UD VKDOO EH IXOO VXSSRUWHG 0LQ 5DIWHU 0LQ 2 DIMENSIONS SERVICE CLEARANCES ...

Страница 10: ...s freezing provision MUST BE made to drain water piping to prevent damage to the Cooler IMPORTANT Ensure the supply piping has been flushed before connecting it to the Cooler A registered licensed plumber MUST install the water supply piping and connection to the Cooler in accordance with the local water supply regulations A bidirectional isolating gate valve on the water supply line shall be plac...

Страница 11: ...SEAL THE ROOF FLASHING If you install an Roof Cap refer to the installation instructions supplied with the Roof Cap and the following guidelines The Colorbond roof flashing installer supplied shall be fixed and sealed to the dropper duct to prevent water entry into the building Installations where the Cooler is more than 4 metres downstream from the roof peak should be fitted with an additional wa...

Страница 12: ... capable of supporting a tradesman and his tools Secure the platform to the ceiling joists ensuring the position enables the required service clearances between Safety Tray and the platform edge refer to diagram below With the Evaporator Module and Safety Tray on the ground remove the Evaporator Module from the Safety Tray and relocate the Safety Tray to within the roof space Position the Safety T...

Страница 13: ...Module 5 1 Lift Fan Assembly 40mm vertically and rotate away from centre 6 Re assemble the Acoustic Cooling Chamber Top repeat step 4 in reverse 7 Re assemble the Toggle Clips repeat step 3 in reverse 8 The Evaporator Module is now ready to lift into the roof space There is a handle at each end of the unit to assist with this As the Cooling pads are now exposed be careful not to damage during the ...

Страница 14: ...the same level The Acoustic Cooling Chamber Top mates correctly with the Evaporator Module ends and sides i e no gaps Toggle clips fit correctly 5 8 EVAPORATOR MODULE PRIMARY DRAIN The drain outlet shall be plumbed to a suitable point in order to disperse the waste water away adequately without causing damage or nuisance i e no overflowing Ensure that all installer supplied drainage pipe is rigid ...

Страница 15: ... it shall be connected to the Aquastop The gate valve shall be secured inside the safety tray a position and cable tie has been made available for this refer to Diagram 10 IMPORTANT DO NOT open the bi directional gate valve at this stage refer to the commissioning section for the initial start up procedure NOTE The bi directional gate valve shall be secured within the Safety Tray with supplied cab...

Страница 16: ... The outlet pop sizes on the Evaporator Module are 18 450mm The ductwork shall be hung off the support platform and joists as shown below The minimum recommended duct length shall be no less than 6m and include 2 x 90 turns one a minimum of 1m from the fan connection and another for connection onto the register The installation shall have at least 1m of straight ø450mm duct on each fan connection ...

Страница 17: ...ove electrical equipment direct sunlight and walls backing onto wall ovens and stoves Avoid cold spots Ensure that the Wall Control is not affected by draughts coming through doorways windows and stairwells and is not placed too close to cooling outlets Avoid dead spots Do not site it in areas with little or no air circulation e g behind doors in corners or alcoves Interference from other electric...

Страница 18: ...e ON must be in Fan Only mode to turn the circulation pump off For the I20 and I10 model fan motor configurations refer to following diagrams I20 I10 model motor configuration When multiple wall controls are installed for zoning they must be installed in sequential order refer to the diagram below for connection information Wall Control location on PCB Fan Motor 2 Fan Motor 1 Fan Motor 4 Fan Motor...

Страница 19: ...B Fans 1 2 Fans 3 4 N A N A 1 1 1 0 3 Three Zones A B C Fan 1 Fan 2 Fans 3 4 N A 1 1 1 1 4 Four Zones A B C D Fan 1 Fan 2 Fan 3 Fan 4 NOTE Dip Switch Up is 1 and Dip Switch Down is 0 Table 3 I10 model Dip Switch Position for 1 to 2 wall controls Dip Switch Position Number of Wall Controls Zone Detail Zone A Zone B 1 0 0 0 Default 1 Common Zone Fans 1 2 N A 1 1 1 1 2 Two Zones A B Fan 1 Fan 2 NOTE ...

Страница 20: ...inutes Longer than 45 minutes Tank has to be filled therefore total time including Pre wet is 5 to 7 minutes 7 3 TANK WATER QUALITY AND REPLENISHMENT DURING OPERATION During the Cooler s operation with the pump operating the Cooler will be evaporating water and automatically refilling itself I Series Coolers will periodically after a specified number of tank refills flush out the tank without stop...

Страница 21: ...n for 2 minutes e When the drain pump turns off the Motorised WinterSeal will open all fans will come on and run for 6 minutes to dry the pads f After the fans turn off the Motorised WinterSeal will close g The Functional Test is now complete isolate power to the unit change the dip switch position back to the Run Setting 1 0 0 0 for one wall control If multiple wall controls are installed refer t...

Страница 22: ...n The Cooler s 3 pin supply plug is correctly located in the power socket For power at the power socket plug in another appliance and test The isolating switches at the unit and the supply power socket are turned ON The unit is turned ON at the Wall Control Call Rinnai for service 9 2 FAN MOTOR WILL NOT START Check The 10 Amp fuse in the meter box has not blown The Cooler s 3 pin supply plug is co...

Страница 23: ...tting I20 Three sliding windows or one door two hinged windows 2 3 m2 1 4 m2 I10 Six hinged windows or four hinged windows and one sliding window 1 8 m2 0 8 m2 10 2 TECHNICAL SPECIFICATIONS Model Weight kg Tank Capacity litres Motor System Amps Fan Blades Control Loom Length m Primary Drain Safety Drain Dry Wet Watts DC Voltage I20 46 62 12 290 48 8 5 20 DN20 pressure pipe 40mm DWV I10 41 55 12 29...

Страница 24: ...all our National Help Line Rinnai recommends that this appliance be serviced every 2 years Head Office 100 Atlantic Drive Keysborough VIC 3173 P O Box 460 Braeside Victoria 3195 Product Sales and Service National Phone 1300 555 545 Fax 1300 555 655 Technical Helpline and Spare Parts National Mon Fri 8am 5 30pm EST Phone 1300 555 545 Fax 1300 300 141 Cost of a local call higher from mobile or publi...

Отзывы: