
Installation & Servicing Instructions Rinnai E-Series
62
14.2.1
Visual inspection for general signs of corrosion
-
Check all gas and water pipes for signs of corrosion.
-
Replace any pipes that are corroded.
14.2.2
Measuring the ionization current
See subsection 12.5 “Measuring the ionization current".
14.2.3
Measuring the inlet gas pressure
See subsection 6.4.1 and .2 “Gas connection with natural gas" and "Gas connection
with propane”.
14.2.5
Testing for gas leaks
See subsection 12.1 “Testing for gas leaks”.
14.2.6
Carrying out a pressure test of the heating system
See chapter 9.2 “Filling the heating system”.
14.2.7
Checking venting systems
Check the following points:
- Is the prescribed combustion air/flue system used?
- Have the instructions for configuring the flue system as specified in the relevant
Installation instruction for the flue gas system been observed?
- Check air intake and flue gas for obstruction or damage.
Содержание E110CN
Страница 18: ...Installation Servicing Instructions Rinnai E Series 18 Boiler basic piping fig 5 ...
Страница 45: ...Installation Servicing Instructions Rinnai E Series 45 electrical ladder diagram figure 21a ...
Страница 99: ...Installation Servicing Instructions Rinnai E Series 99 ...
Страница 106: ...Installation Servicing Instructions Rinnai E Series 106 Parts rear wall E Series 81 84 78 79 77 ...
Страница 119: ...Installation Servicing Instructions Rinnai E Series 119 ...
Страница 120: ......
Страница 138: ...Installation Servicing Instructions Rinnai E Series 138 Tuyeauterie de base de chaudière fig 5 ...
Страница 166: ...Installation Servicing Instructions Rinnai E Series 166 Schéma électrique en échelle figure 21a ...