
Installation & Servicing Instructions Rinnai E-Series
61
13
Maintenance
Maintenance or changes to the boiler may only be carried out by a qualified
technician.
13.1 Periodic examination of venting systems and boiler
The inspection of the boiler and venting system should be done every 2 years and
full maintenance every 4 years or 4000 hours of operation, whichever occurs first..
When doing this the circumstances of the boiler’s location must be taken into account.
From this one can determine whether to deviate from this advice.
Please contact Rinnai for further guidance on the frequency and service
requirements. Contact details can be found on the back page of this manual.
13.2 Inspection
Preparing the boiler for inspection
To carry out the maintenance activities please follow the next procedure:
- switch off the power supply;
- shut off the gas;
- valve off the boiler from the system using the boiler isolation valves in the plumbing
kit.
-
remove the 4 screws A,B,C and D in the quick releases of the casing (figure 29);
- remove the screw E behind the door on the front of the casing (figure 30);
- remove it towards the front.
- clean the casing with a cloth with a simple (non-abrasive) cleaning agent;
NOTICE
i
NOTICE
i
Removing casing figure29
Removing casing figure 30
Содержание E110CN
Страница 18: ...Installation Servicing Instructions Rinnai E Series 18 Boiler basic piping fig 5 ...
Страница 45: ...Installation Servicing Instructions Rinnai E Series 45 electrical ladder diagram figure 21a ...
Страница 99: ...Installation Servicing Instructions Rinnai E Series 99 ...
Страница 106: ...Installation Servicing Instructions Rinnai E Series 106 Parts rear wall E Series 81 84 78 79 77 ...
Страница 119: ...Installation Servicing Instructions Rinnai E Series 119 ...
Страница 120: ......
Страница 138: ...Installation Servicing Instructions Rinnai E Series 138 Tuyeauterie de base de chaudière fig 5 ...
Страница 166: ...Installation Servicing Instructions Rinnai E Series 166 Schéma électrique en échelle figure 21a ...