
8W
.51.60.00/1
1.09
Changes reserved.
I n s t a l l a t i o n & S e r v i c i n g
Instructions
Pictured: E75CN, E110CN
E75CP, E110CP
High efficiency condensing gas boiler
E75CN/E110CN
E75CP/E110CP
- Do not store or use gasoline or other flammable vapors and
liquids in the vicinity of this or any other appliance.
- WHAT TO DO IF YOU SMELL GAS
- Do NOT try to light any appliance.
- Do NOT touch any electrical switch.
- Do NOT use any phone in your building.
- Immediately call your gas supplier from a neighbor’s phone.
Follow the gas supplier’s instructions.
- If you cannot reach your gas supplier, call the fire department.
CAUTION!
Read this manual thoroughly before installing, servicing, putting
into operation or using this boiler and vent system.
WARNING!
Improper installation, adjustment, alteration, service or
maintenance can cause property damage, personal injury
(exposure of hazardous materials)* or loss of life. Refer to the
user's information manual provided with this boiler. Installation
and service must be performed by a qualified installer, service
agency or the gas supplier (who must read and follow the supplied
instructions before installing, servicing, or removing this boiler.
This boiler contains materials that have been identified as
carcinogenic, or possibly carcinogenic, to humans).
CAUTION!
The user manual is part of the documentation that is delivered
to the installation's operator. Go through the information in this
manual with the owner/operator and make sure that he or she is
familair with all necessary operating instructions.
NOTICE!
Installation and service must be performed by a qualified
installer, service technician or the gas supplier.
WARNING!
If you do not follow these instructions exactly, a fire or explosion
may result causing property damage, personal injury or loss of life.
These instructions to be retained by user.
Address: 103 International Drive, Peachtree City, GA, 30269
Toll-free: 1-800-621-9419
•
Fax: 678-829-1666
•
www.rinnai.us
Français: voir page 121
Содержание E110CN
Страница 18: ...Installation Servicing Instructions Rinnai E Series 18 Boiler basic piping fig 5 ...
Страница 45: ...Installation Servicing Instructions Rinnai E Series 45 electrical ladder diagram figure 21a ...
Страница 99: ...Installation Servicing Instructions Rinnai E Series 99 ...
Страница 106: ...Installation Servicing Instructions Rinnai E Series 106 Parts rear wall E Series 81 84 78 79 77 ...
Страница 119: ...Installation Servicing Instructions Rinnai E Series 119 ...
Страница 120: ......
Страница 138: ...Installation Servicing Instructions Rinnai E Series 138 Tuyeauterie de base de chaudière fig 5 ...
Страница 166: ...Installation Servicing Instructions Rinnai E Series 166 Schéma électrique en échelle figure 21a ...