Rinnai Demand Rapid DD1200E315L Скачать руководство пользователя страница 16

 

 16

   |   Demand Rapid owner & installer guide 12949-B 02-19

General installation information

Cold water inlet

32 mm fitting on the left hand side of the cylinder, approximately 285 mm above the ground. For 

ease of draining it is advisable to fit a ‘tee’ piece with a capped valve or drain line between the cold 

water isolation valve and cold water inlet connection on the cylinder.

Hot water outlet

32 mm fitting on the left hand side of the cylinder. Ensure adequate insulation/lagging is fitted to 

the hot water pipe to minimise heat loss. Pipe sizing must be sized to allow sufficient water flow to 

the hot water fixtures.

The Demand Rapid will deliver 75 °C water to the 

plumbing system. Ensure the system components are 

designed to operate continuously at this temperature.

For installations where the hot water supply temperature 

must be lower, one of the following plumbing 

modifications are required.

1.  Install a tempering valve between the inlet and outlet  

    of the storage water heater to reduce the temperature. 

2.  Re-plumb the INFINITY gas water heater to the hot  

     water return connection as shown. This will 

     reduce the hot water temperature being delivered to 

     approximately 70 °C.

Pressure limiting valve

500 kPa maximum

Cold water expansion valve

700 kPa maximum

Cylinder thermostat setting

To meet the New Zealand Building code requirement

1

 to disinfect water for legionella bacteria

2

, the 

cylinder thermostat has been set to 65 °C

.

1 Clause G12.3.9, Acceptable Solution G12/AS1 6.14.3
2 Legionella is a bacterium that can cause Legionnaires’ disease—a severe form of pneumonia

WARNING

Delivery temperatures

Sanitary fixture delivery temperatures

Water temperatures over 55 °C can cause severe scalds. Local regulations must be considered 

regarding temperature limitations of hot water supplied to areas used primarily for personal 

hygiene. The temperature is limited to 45 °C for early childhood centres, schools, nursing 

homes or similar facilities, and 55 °C for all other buildings. To comply with these requirements a 

temperature limiting device, such as a tempering or thermostatic mixing valve will be required on 

all installations.

Содержание Demand Rapid DD1200E315L

Страница 1: ...y storage system Owner and installer guide Models DD1200E315N L DD1200i315N L DD1212E315N L DD1212i315N L DD1250E315N L Installer Please leave this guide with the owner as it contains important safety...

Страница 2: ...d by an authorised person being in New Zealand a licensed gasfitter Warning Improper installation adjustment alteration service and maintenance can cause property damage personal injury or loss of lif...

Страница 3: ...ummary 9 DD1200E315 specification 10 DD1200i315 specification 11 DD1212E315 specification 12 DD1212i315 specification 13 DD1250E315 specification 14 Location 15 General installation information 16 Del...

Страница 4: ...o not block or seal the valve s or drain pipe s The system must not be operated unless these devices are fitted and are in good working order Rinnai INFINITY safety devices flame failure boil dry prot...

Страница 5: ...uired whenever the appliance is connected to the power supply If power has failed and there is risk of damage from frost turn off the gas supply to the unit and open a tap slightly to allow flow throu...

Страница 6: ...ths may result in the water heater exploding Continuous leaking of water from the valve s may indicate a problem It is important that you raise and lower the easing gear gently During operation if the...

Страница 7: ...4 Thermal fuse and or OH switch activated Unit operates then stops Owner Service call Installer Check thermal fuse and OH switch If either are faulty check the heater for damage confirm gas type press...

Страница 8: ...operation errors are not covered by the Rinnai warranty Troubleshooting general system troubleshooting What s happening Possible cause Explanation and or possible solution Delivery temperature not ho...

Страница 9: ...residential applications where a large quantity of hot water is required quickly but there is recovery time available before next use For example filling a machine or spa bath Hard or aggressive water...

Страница 10: ...MJ h Output 45 9 kW Weights Empty 82 kg Full 402 kg Water pressure Min 150 kPa Max 850 kPa Hot water delivery Raised 25 C 1500 L h Raised 35 C 1250 L h Raised 45 C 950 L h Raised 50 C 875 L h Raised 5...

Страница 11: ...Output 44 5 kW Weights Empty 82 kg Full 402 kg Water pressure Min 150 kPa Max 850 kPa Hot water delivery Raised 25 C 1500 L h Raised 35 C 1250 L h Raised 45 C 950 L h Raised 50 C 875 L h Raised 55 C...

Страница 12: ...7 kW Weights Empty 90 kg Full 410 kg Water pressure Min 150 kPa Max 850 kPa Hot water delivery Raised 25 C 1700 L h Raised 35 C 1400 L h Raised 45 C 1200 L h Raised 50 C 1100 L h Raised 55 C 1000 L h...

Страница 13: ...55 7 kW Weights Empty 90 kg Full 410 kg Water pressure Min 150 kPa Max 850 kPa Hot water delivery Raised 25 C 1700 L h Raised 35 C 1400 L h Raised 45 C 1200 L h Raised 50 C 1100 L h Raised 55 C 1000 L...

Страница 14: ...tput 57 8 kW Weights Empty 90 kg Full 410 kg Water pressure Min 150 kPa Max 850 kPa Hot water delivery Raised 25 C 1700 L h Raised 35 C 1400 L h Raised 45 C 1200 L h Raised 50 C 1100 L h Raised 55 C 1...

Страница 15: ...omponents Where the system is not accessible the Rinnai warranty will not cover any additional costs caused by access difficulty The system must be accessible without the use of a ladder or scaffold C...

Страница 16: ...rage water heater to reduce the temperature 2 Re plumb the INFINITY gas water heater to the hot water return connection as shown This will reduce the hot water temperature being delivered to approxima...

Страница 17: ...other restrictions should not be installed with the relief vent line TPR valve drain line should not be joined to other drain lines Gas connection Check gas type of the Rinnai INFINITY matches the ga...

Страница 18: ...reprogrammed contact Rinnai for assistance If hotter water is required the cylinder and the Rinnai INFINITY dip switches will need to be adjusted 8 Plug 3 core flex into suitably earthed general powe...

Страница 19: ...installer guide 12949 B 02 19 19 Commissioning Fill the cylinder as detailed on the previous page and commission the Rinnai INFINITY in accordance with the commissioning sheet attached to the front c...

Страница 20: ...press warranty period recorded in the table above This warranty does not limit any consumer rights or guarantees that may apply under the Consumer Guarantees Act 1993 If the product is being acquired...

Страница 21: ...authorised service centre travel costs shall be the owner s responsibility Warranty exclusions The following exclusions may cause the warranty to become void and will result in a service charge and c...

Страница 22: ...tinuous fall of at least 2 from water heater to discharge point Lengths and bends in accordance with the table below Lengths and changes of direction Max length m 9 8 7 6 Max changes of direction grea...

Страница 23: ...ith any adjacent soil or waste stack The discharge point of the common stack is such that any discharge is readily visible and will not cause any nuisance The common stack is vented by extending the p...

Страница 24: ...Rinnai co nz 0800 746 624 http www youtube com rinnainz http www facebook com rinnainz 12949 B...

Отзывы: