![RightAngle NewHeights 4 Series Скачать руководство пользователя страница 7](http://html1.mh-extra.com/html/rightangle/newheights-4-series/newheights-4-series_instructions-manual_1460714007.webp)
Page 7 OF 8
K&A Manufacturing
6703 Zinser Street Schofield, WI 54476
Phone: 800.298.4351
Fax: 866.882.9475
www.raproducts.com
Step 7:
Slide the crank/bracket/clamp assembly
11
onto the hex rod protruding from the front of the right
leg assembly
2
. Align the holes in the bracket with
.the pilot holes in the worksurface
1
. Attach it with
(4) wood screws
5
.
Step 8:
With the help of an assistant, set the work-
station upright in its final location. Level the unit if
required by turning the leveling glides clockwise (from
the top) on the low corners of the workstation. If your
workstation has casters, level it by turning the bolts
at the top of the casters.
Instruction # 53520
Detail D
2
1
11
5
Detail C
Hex Rod
3.750
To Face of Bracket
.125-.250
Step 7
Leveling Glide
Note:
The position of the
crank handle can be adjusted
in or out by loosening the screw
in the clamp and sliding the
crank handle to the desired
position. Place the clamp
against the back of the
bracket and re-tighten
the screw.
C