Riello RS 310/M MZ Скачать руководство пользователя страница 37

35 

20075344

GB

Maintenance

7.1

Notes on safety for the maintenance

The  periodic  maintenance  is  essential  for  the  good  operation,
safety, yield and duration of the burner.

It allows you to reduce consumption and polluting emissions and
to keep the product in a reliable state over time.

Before carrying out any maintenance, cleaning or checking oper-
ations:

7.2

Maintenance programme

7.2.1

Maintenance frequency

7.2.2

Checking and cleaning

Combustion
The optimum calibration of the burner requires an analysis of the
flue gases. 
Significant  differences  with  respect  to  the  previous  measure-
ments indicate the points where most care should be exercised
during maintenance.

Combustion head
Open  the  burner  and  make  sure  that  all  components  of  the
combustion head are in good  condition,  not deformed by  the
high  temperatures,  free  of  impurities  from  the  surroundings
and correctly positioned.

Burner
Check that there are not excess wear or loosen screws.
Clean the outside of the burner.

Fan
Check to make sure that no dust has accumulated inside the fan
or on its blades, as this condition will cause a reduction in the air
flow rate and provoke polluting combustion.

Boiler
Clean the boiler as indicated in its accompanying instructions in
order  to  maintain  all  the  original  combustion  characteristics  in-
tact, especially the flue gas temperature and combustion cham-
ber pressure.

Flame presence check

The  burner  is  fitted  with  an  ionisation  system  to  check  that  a
flame is present (Fig. 38). The minimum current for control box
operation is 6 µA. The burner provides a much higher current, so
controls are not normally required. However, if it is necessary to
measure the ionisation current, disconnect the plug-socket on the
ionisation probe cable and insert a direct current microammeter
with a base scale of 100 µA. Carefully check polarities!

Gas leaks
Make sure that there are no gas leaks on the pipe between the
gas meter and the burner.

Gas filter
Change the gas filter when it is dirty.

7

Maintenance

DANGER

The maintenance interventions and the calibration
of the burner must only be carried out by qualified,
authorised personnel, in accordance with the con-
tents  of  this  manual  and  in  compliance  with  the
standards and regulations of current laws.

DANGER

Disconnect  the  electrical  supply  from  the  burner
by means of the main system switch.

DANGER

Turn off the fuel interception tap.

Wait  for  the  components  in  contact  with  heat
sources to cool down completely.

The gas combustion system should be checked at
least once a year by a representative of the man-
ufacturer or another specialised technician.

The  operator  must  use  the  required  equipment
during maintenance.

Fig. 38

20073940

Содержание RS 310/M MZ

Страница 1: ...uctions 20075344 4 01 2015 Forced draught gas burners Modulating operation CODE MODEL TYPE 20068343 20068351 20061373 RS 310 M MZ 1142T 20068356 20068361 20067141 RS 410 M MZ 1143T 20068027 RS 510 M M...

Страница 2: ...Translation of the original instructions...

Страница 3: ...trical panel description 14 4 13 Control box RMG88 15 4 14 Servomotor SQM40 16 4 15 Calibration of the thermal relay 17 5 Installation 18 5 1 Notes on safety for the installation 18 5 2 Handling 18 5...

Страница 4: ...Operation 32 6 8 3 Ignition failure 32 6 8 4 Burner flame goes out during operation 32 6 9 Burner start up cycle diagnostics 33 6 9 1 Resetting of control box and diagnostics use 33 6 9 2 Control box...

Страница 5: ...ed as follows CE 0085CP0166 RS 310 M MZ Class 2 EN 676 CE 0085CP0166 RS 410 M MZ Class 2 EN 676 CE 0085CP0166 RS 510 M MZ Class 2 EN 676 CE 0085CP0166 RS 610 M MZ Class 2 EN 676 The quality is guarant...

Страница 6: ...ed out correctly may cause damage to the ma chine and or injury to people DANGER DANGER LIVE COMPONENTS This symbol indicates operations which if not car ried out correctly lead to electric shocks wit...

Страница 7: ...vent of damage to things or injury to people if such damage injury was due to any of the following causes incorrect installation start up use and maintenance of the burner improper incorrect or unreas...

Страница 8: ...intenance Only those parts envisaged by the manufacturer can be replaced 3 2 Personnel training The user is the person body or company that has acquired the machine and intends to use it for the speci...

Страница 9: ...atural gas Gas oil Gas oil Methane Adjustment Flame control system FS1 FS2 Standard 1 stop every 24 h Continuous working 1 stop every 72 h Electrical supply of the system 3 400 50 3 230 50 Voltage of...

Страница 10: ...at max output 2 Gas G20 G25 mbar 33 2 49 5 41 7 62 48 9 73 64 6 96 4 Operation Intermittent Standard applications Boilers water steam diathermic oil Ambient temperature C 0 40 Combustion air temperat...

Страница 11: ...d electrical power kW max 9 1 10 8 Protection level IP 54 STAR TRIANGLE START UP Model RS 310 M MZ RS 410 M MZ RS 510 M MZ RS 610 M MZ Code 20061373 20067141 20068027 20066706 Main electrical supply 3...

Страница 12: ...ositions The l position is reference for the refractory thickness of the boiler door Maximum position for the extraction of the servomotor cover Tab G Model kg RS 310 M MZ 250 RS 410 M MZ 250 RS 510 M...

Страница 13: ...diagram Tab H Model kW RS 310 M MZ 600 RS 410 M MZ 800 RS 510 M MZ 800 RS 610 M MZ 820 WARNING The firing rate value Fig 3 has been obtained considering an ambient temperature of 20 C an atmospheric...

Страница 14: ...pecial test boilers accord ing to EN 676 regulations In Fig 4 you can see the diameter and length of the test combus tion chamber Example RS 610 M MZ Output 5000 kW diameter 100 cm length 5 m 4 10 Bur...

Страница 15: ...ch 19 Combustion head air pressure test point 20 Maximum gas pressure switch with pressure test point 21 Flame sensor probe 22 Pressure test point for air pressure switch 23 Gas train adapter 24 Gas b...

Страница 16: ...n contacts for signalling the burner is in lockout 11 Auxiliary circuits fuse includes a spare fuse 12 Timer for star triangle start up 13 Main terminal supply board 14 Supply cables and external conn...

Страница 17: ...development of conden sate and humidity Otherwise before switching on again make sure that the entire control box is perfectly dry Static charges must be avoided since they can damage the control box...

Страница 18: ...echnical data WARNING To avoid accidents material or environmen tal damage observe the following instruc tions Avoid opening modifying or forcing the ser vomotor Mains voltage 230 V 15 10 Mains freque...

Страница 19: ...calibration 2 see the table in the wiring diagram To reset in case of an intervention of the thermal relay press the RESET button 1 of Fig 10 The red TEST button 3 opens the NC 95 96 contact and stop...

Страница 20: ...ust be free from hazardous mixes e g chloride fluoride halo gen if present it is highly recommended to carry out cleaning and maintenance more frequently WARNING The handling operations for the burner...

Страница 21: ...water cooled front piece a refractory lining 2 5 Fig 14 is not necessary unless expressly requested by the boiler manufacturer Tab I 5 6 Securing the burner to the boiler Fit the heat insulation suppl...

Страница 22: ...elease the cables of the probe 5 and electrode 11 E Fully open the burner as in Fig 15 F Undo the screw 4 with pressure test point G Release the head by lifting it from its housing 3 then take out the...

Страница 23: ...by turning the screw 1 clockwise Fig 18 Central air adjustment The factory setting is shown in Tab J Tab J In the event that the specific application requires a particular ad justment it is possible t...

Страница 24: ...tion Below is a diagram Fig 20 that shows the recommended ad justment of the combustion head NOTE Depending on the specific application the adjustment can be modified Fig 20 20078016 No Setpoint air g...

Страница 25: ...urners with maximum outputs over 1200 kW 9 Gasket for flanged versions only 10 Pressure adjuster 11 Train Burner adaptor supplied separately P2 Upline pressure of valves adjuster P3 Upstream pressure...

Страница 26: ...er gas train combination manual 5 11 3 Gas train installation DANGER Disconnect the electrical power using the main switch Check that there are no gas leaks Pay attention when handling the train dang...

Страница 27: ...tput value in the table Tab K for the burner in question read on the right column 1 the pressure at the test point P1 Fig 25 Add this value to the estimated pressure in the combustion chamber Example...

Страница 28: ...s means it should compulsorily be stopped at least once every 24 hours to enable the control box to check its own efficiency at start up Normally the boiler s thermostat pressure switch ensures that t...

Страница 29: ...ly valve Completes a rotation of 90 in 30 s After the adjustment made in the factory to its 6 cams to allow an initial ignition Check that they are as shown below In the event of a modification follow...

Страница 30: ...r supply Release by pressing the button on thermal relay see section 4 15 on page 17 If ignition is still not achieved it may be that gas is not reaching the combustion head within the safety time per...

Страница 31: ...e angle of cam III Fig 28 and by using the selector 2 Fig 29 To adjust the cam of the servo motor see Fig 32 A 6 6 3 Maximum output The MAX output must be set within the firing rate indicated in Fig 3...

Страница 32: ...required Adjustment of gas delivery After adjusting the maximum and minimum output of the burner carry out air adjustment on higher intermediate positions of the servomotor The passage from one positi...

Страница 33: ...anticlockwise until the burner locks out Turn the knob clockwise by 2 mbar and repeat the start up of the burner If the burner locks out again turn the knob clockwise again by 1 mbar 6 7 3 Minimum gas...

Страница 34: ...x continues to check the presence of the flame and the correct position of the air and gas maximum pressure switches If the temperature or the pressure is low so the thermostat pressure switch TR is c...

Страница 35: ...blinked The number of blinks indicates the reason for the malfunctioning refer to the coding in Tab U on page 38 6 9 4 Software diagnostics Gives an analysis of the life of the burner through optical...

Страница 36: ...pulses of the LED constitute a signal spaced by approxi mately 3 seconds The number of pulses will measure the probe detection time since the opening of gas valves according to Tab R Tab R This is up...

Страница 37: ...r to maintain all the original combustion characteristics in tact especially the flue gas temperature and combustion cham ber pressure Flame presence check The burner is fitted with an ionisation syst...

Страница 38: ...G 25 11 5 9 5 8 8 100 170 G 30 14 0 11 6 10 7 100 230 G 31 13 7 11 4 10 5 100 230 WARNING The specified life cycles do not refer to the warran ty terms indicated in the delivery or payment con dition...

Страница 39: ...h on and the lock out appears Air pressure switch in operating position Adjust or replace The burner switches on but then stops in lockout Air pressure switch does not switch owing to lack of air pres...

Страница 40: ...ce The burner continues to repeat the start up cy cle without lockout The gas pressure in the gas mains lies very close to the value to which the gas pressure switch has been set The sudden drop in pr...

Страница 41: ...regulator Code All models RWF 50 2 3 POINT OUTLET 20073595 All models RWF 55 5 COMPLETE WITH RS 485 INTERFACE 20074441 All models RWF 55 6 COMPLETE WITH RS 485 PROFIBUS INTERFACE 20074442 Burner Probe...

Страница 42: ...ram RS 610 M MZ 400 V Star Triangle Start Up 4 Functional layout RS 310 410 M MZ 230 400 V Direct Start Up Functional layout RS 310 410 510 610 M MZ 400 V Star Triangle Start Up 5 Functional layout RM...

Страница 43: ...K 5 K 5 K 5 1 T 0 AC K 1 K 0C A K O AE F T G C K F CO K U 50 K G G0 T A K GA 0 K AD K GAV0 A T AC C K A K AC5G K ACD O T 0 C K O D K 0 K O CGT A 0 C K CA 0G K CA 0G K CA 0G DT C DDC K C D K C D K C DD...

Страница 44: ...5 T 5 K 5 K 5 K 5 1 T AC K 1 K C A K O AE F T G C K F CO K U 5 K G G T A K GA K AD K GAV A T AC C K A K AC5G K ACD O T C K O D K K O CGT A C K CA G K CA G K CA G DT C DDC K C D K C D K C DD GFT GA G C...

Страница 45: ...K 5 K 5 K 5 1 T 0 AC K 1 K 0C A K O AE F T G C K F CO K U 50 K G G0 T A K GA 0 K AD K GAV0 A T AC C K A K AC5G K ACD O T 0 C K O D K 0 K O CGT A 0 C K CA 0G K CA 0G K CA 0G DT C DDC K C D K C D K C DD...

Страница 46: ...5 T 5 K 5 K 5 K 5 1 T AC K 1 K C A K O AE F T G C K F CO K U 5 K G G T A K GA K AD K GAV A T AC C K A K AC5G K ACD O T C K O D K K O CGT A C K CA G K CA G K CA G DT C DDC K C D K C D K C DD GFT GA G...

Страница 47: ...K L 4 5 7 T 27 K 27 K 2 7 K 2 7 1 T BD K 2 1 K DAB K O BE F T GA 22D K F 22DO K U 7 K G 2 G T B K GB K B6 K GBV B T BD D K B K BD7G K BD6 O T A D K O A6 K 2 K O A DGT B AD K DB G K DB G K DB G 6T AD2...

Страница 48: ...L K L 4 5 7 T 27 K 27 K 2 7 K 2 7 1 T BD K 2 1 K DAB K O BE F T GA 22D K F 22DO K U 7 K G 2 G T B K GB K B6 K GBV B T BD D K B K BD7G K BD6 O T A D K O A6 K 2 K O A DGT B AD K DB G K DB G K DB G 6T A...

Страница 49: ...L K L 4 5 7 T 27 K 27 K 2 7 K 2 7 1 T BD K 2 1 K DAB K O BE F T GA 22D K F 22DO K U 7 K G 2 G T B K GB K B6 K GBV B T BD D K B K BD7G K BD6 O T A D K O A6 K 2 K O A DGT B AD K DB G K DB G K DB G 6T AD...

Страница 50: ...L K L 4 5 7 T 27 K 27 K 2 7 K 2 7 1 T BD K 2 1 K DAB K O BE F T GA 22D K F 22DO K U 7 K G 2 G T B K GB K B6 K GBV B T BD D K B K BD7G K BD6 O T A D K O A6 K 2 K O A DGT B AD K DB G K DB G K DB G 6T AD...

Страница 51: ...47H2 A6 G B 2 C A6 H C I2896 C B6 3 B9 G J6 56 C B 669 C J6 C B K9 5 G C 65 C 8B6 C H7 G 3 294 C H7 6 C 3 294 C H6 BG 2 294 C 29B6 C 29B6 C 29B6 J G J 6 C J 6 C J 6 C J 6 BAG B B C B 6A C B C B 28 G...

Страница 52: ...A1E6 A E6 4 H 4 A 4 7 A 4 7 A 4 3 4 H 7 A 4 35 A A 58I3 D7 H B 3 A D7 I A J3 7 A B7 4 B H 7 67 A B 77 A 7 A B K 6 H A 76 A B7 A I8 H 4 3 5 A I8 7 A 4 3 5 A I7 BH 3 3 5 A 3 B7 A 3 B7 A 3 B7 H 7 A 7 A 7...

Страница 53: ...D 9 M 7C E D 9 E CB7 E 8N 7A G M 2B DDC E G DDCN E O E 2 D 2 M P 7 E 27 E P 71 E 27Q 7 M 7C C E 7 E 7C 2 E 7C1 N8 M B C E N8B1 E D E N B C2M 7 BC E C7 2 E C7 2 E C7 2 P1M PBCD 11C E PBCD 1 E PBCD 1 E...

Страница 54: ...6 M 6B F 6B 9 F 6B9 F 6B 6 M 9CA F 6B 7 F A C F 7 N C 9 M D BBA F 9BBAN F O 9 F D9B6 D M 9C89 F DC99 F 9CE F DCP C8 M CA A F C98 F CA D9 F CAE N M 6 7A F N E9 F 6B 7 F N9 ADM C 7 A F AC D9 F AC D9 F...

Страница 55: ...C9D E G 1 U A1 C A1 C A 1 C A 1 K U B0 C A K C 0 B C V B F U 3 AA0 C F AA0V C W 1 C 3 A 3 U 2 B C 3B C 2 B5 C 3BX B U B0 0 C B C B013 C B05 V U 0 C V 5 C A C V 03U B 0 C 0B 3 C 0B 3 C 0B 3 25U 2 0A 55...

Страница 56: ...9 DKE6 G DKE 0 DKE 3 DKE 1 6 L 60 D 60 D 60 D 60 65 L 3 8B D 60 5 D 3B28 D M 8A F L C2 00B D F 00BM D N 3 D C 06 C3 L O 8 D C8 3 D O 8 D C8P3 8 L 8B B D 8 D 8B C D 8B M L 62 3 B D M 2 D 60 3 D M 2 BCL...

Страница 57: ...J J J2 J J I I M C M C N 9C K 9C6 K 96C K 93C E N 6 8 K 934E K 8 K 4FD3 O6 N 3998 K O6998D K P3C 6 K 69 N Q6 56 K 66 K Q6 K G 5 N 8 8 K 65 K 8C 6 K 8 DF N 3 48 K DF 6 K 93 4 K D6 8 N 3 3 4 8 K 8 3 6...

Страница 58: ...J 3 O A6 J PK6 A 56 86 J C 556 6 6 J 3 6 A6 J A6 A 5 6 8 A56 8G 1 83JUV 8 GX DDS 1 EJ CKG 7I 5 7I GX DDS 1 EJ CKG 5 I 6 6 6 I K56K 6 J A6 IK 6 I K 6 CK N 6 K 8K5 4 5 36 C 66 K 56 G 7I G 7I I A 5 K 3 6...

Страница 59: ...K8 6K J 3 O A6 J PK6 A 56 86 J F 556 6 6 J 3 6 A6 J A6 A 5 6 8 A56 8 1 83JUV 8 7I 7I I 6 6 6 I K56K 6 J A6 IK 6 I K 6 FK N 6 K 8K5 4 5 36 F 66 K 56 7I I A 5 K 3 6 I 6 6 I5 36 I K56K IK 6 5 9 K 5 I5 I...

Страница 60: ...H 6 L 6 K8 6K J 3 O A6 J PK6 A 56 86 J F 556 6 6 J 3 6 A6 J A6 A 5 6 8 A56 8 2 83JUV 8 7I 7I I 6 6 6 I K56K 6 J A6 IK 6 I K 6 FK N 6 K 8K5 4 5 36 F 66 K 56 7I I A 5 K 3 6 I 6 6 I5 36 I K56K IK 6 5 9...

Страница 61: ...6 M 6 N O 6 M 6 N 7 R 7 S 7 S 7 S 7 6 7 R S 7 68 S S 8CO6 F B R 6 S B O S T6 S 7 R E 9 S S E S D 9 R S 9 S S OC R 7 6 8 S OC S 7 6 8 S O R 6 6 8 S 6 S 6 S 6 E R E S E S E S E BR S B S S 6 R 6 S S S 6...

Страница 62: ...9 A 5BBBBB G9 AH A 4 Y6978 36 23DDBBZ G 4 4 G 5 5 CBBBB AX 5 AA 2 2 1 1 0 AYCZ AX 1 Y6978 36 23DDBBZ 4 G G AY Z D A A 1 0 4 7 H 7 H 7 H 7 9 6 H 7 1 H 960 H 1 2 8 G0 776 H 8 7762 H 9 H G 7 G9 H G 9 H...

Страница 63: ...e starter triangle contactor KS1 Start triangle starter star contactor KSM Relay KST1 Star triangle starter timer K1 Clean contacts output relay burner operating K2 Clean contacts output relay burner...

Страница 64: ...Subject to modifications RIELLO S p A I 37045 Legnago VR Tel 39 0442 630111 http www riello it http www riello com...

Отзывы: