20168262
28
GB
Installation
5.14
Gas supply
5.14.1 Gas feeding line
Key (Fig. 34 - Fig. 35 - Fig. 36 - Fig. 37)
1
Gas input pipe
2
Manual valve
3
Vibration damping joint
4
Pressure gauge with push-button cock
5
Filter
6A Includes:
– filter
– safety valve
– pressure adjuster
– working valve
6C Includes:
– safety valve
– working valve
6D Includes:
– safety valve
– working valve
7
Minimum gas pressure switch
8
Leak detection control, provided as an accessory or integrat-
ed, based on the gas train code. In compliance with the EN
676 standard, gas valve leak detection control devices are
compulsory for burners with maximum outputs over
1,200 kW.
9
Gasket, for "flanged" versions only
10 Pressure adjuster
11 Train-Burner adaptor, supplied separately
P2 Upstream pressure of valves/adjuster
P3 Upstream pressure of the filter
L
Gas train, supplied separately
L1 The responsibility of the installer
Explosion danger due to fuel leaks in the pres-
ence of a flammable source.
Precautions: avoid knocking, attrition, sparks and
heat.
Make sure that the fuel interception tap is closed
before performing any operation on the burner.
WARNING
WARNING
The fuel supply line must be installed by qualified
personnel, in compliance with current standards
and laws.
Fig. 34
20057264
MB
Fig. 35
20062223
MBC
Fig. 36
20062227
DMV
Fig. 37
20062228
CB
Содержание RLS 120/E FGR
Страница 2: ...Translation of the original instructions ...
Страница 50: ...20168262 48 GB Appendix Electrical panel layout 0 0 0 0 1 2 3 2 1 3 4 1 5 5 5 6 5 7 5 5 5 5 5 5 5 5 5 5 6 5 ...
Страница 51: ...49 20168262 GB Appendix Electrical panel layout 01 2 3 4506 7 891 01 ...
Страница 52: ...20168262 50 GB Appendix Electrical panel layout 0 1 2 2 2 0 ...
Страница 54: ...20168262 52 GB Appendix Electrical panel layout 0 0 0 12 3456 7 12 3456 7 ...
Страница 57: ...55 20168262 GB Appendix Electrical panel layout 0 0 1 2 3 4 5 667 8 667 2 9 63 8 63 63 3 5 ...