15
20168262
GB
Technical description of the burner
4.14
Operation sequence of the burner (LIGHT OIL operation)
Tab. H
Key to layout (Fig. 8)
X01
Oil valve 1st level
X02
Oil valve 2nd level
X03
Oil valve 3rd level
X04
Ignition transformer
X05
Oil pressure > min.
X06
Oil safety circuit
X07
Boiler safety circuit
X08
Air pressure switch
X10
Burner on
X20+X21 Flame signal
X25
Fan on
X26
Oil pump
X32
Air servomotor
X33
Fuel servomotor
X34
FGR servomotor (disabled)
Fig. 8
X07
X06
X10
X08
X20+X21
X32+X33
X34
X4
X03
X01
X02
X25
S9782
CPI/POC
X26
X05
CPI= Closed Position Indicator
POC= Proof Of Closure
(3) Oil irrelevance time P323, has an effect on the oil safety chain and on the minimum oil pressure when the air valve is opened.
Any position
t1
Safety circuits enabling standby time
(boiler and fuel)
t2
Gas valve opening time (with valve leak
detection control device active)
2.4 s
t3
Servomotor opening time
30/60 s
t4
FGR servomotor activation time
0 - t5
t5
Pre-purging time
adjustable
t6
Pre-ignition time
adjustable
t7
Flame ignition safety time
3s
t8
Flame stabilisation time
adjustable
t9’
2nd stage safety time
3s
t10
Modulation phase
t11
Adjustment time
t12
Gas valve opening time (with valve leak
detection control device active)
3s
t13
Post-purging time
adjustable
t15
post-combustion time
adjustable
t16
Flame switching off control time
5 s
t17
Gas valve control time (with valve leak
detection control device active)
30s
Содержание RLS 120/E FGR
Страница 2: ...Translation of the original instructions ...
Страница 50: ...20168262 48 GB Appendix Electrical panel layout 0 0 0 0 1 2 3 2 1 3 4 1 5 5 5 6 5 7 5 5 5 5 5 5 5 5 5 5 6 5 ...
Страница 51: ...49 20168262 GB Appendix Electrical panel layout 01 2 3 4506 7 891 01 ...
Страница 52: ...20168262 50 GB Appendix Electrical panel layout 0 1 2 2 2 0 ...
Страница 54: ...20168262 52 GB Appendix Electrical panel layout 0 0 0 12 3456 7 12 3456 7 ...
Страница 57: ...55 20168262 GB Appendix Electrical panel layout 0 0 1 2 3 4 5 667 8 667 2 9 63 8 63 63 3 5 ...