20094184
10
GB
Installation
5.4
Operating position
5.5
Boiler fixing
Fix the bolt (6) and nut (7) onto the flange (1) as in Fig. 5.
Fix the flange (1) to the appliance (4) using the supplied nuts
(3) with the gasket (5) inbetween as in Fig. 6.
Insert the burner tube through the flange and push to ensure
full insertion. With the burner collar fully inserted into the
flange the O-ring will form a seal.
Fix the securing nut (8)(Fig. 6) onto the bolt (6).
WARNING
The burner is designed to operate only in the po-
sitions
1, 2, 3 and 4
.
Installation
1
is preferable, as it is the only one that
allows the maintenance operations as described
in this manual.
The installations
2, 3 and 4
permit operation but
make maintenance and inspection of the combus-
tion head more difficult, pag. 27.
WARNING
Any other positioning could compromise the cor-
rect operation of the appliance.
The installation
5
is prohibited for safety reasons.
Fig. 4
D4618
1
2
3
4
5
1
Fig. 5
8
7
6
WARNING
The seal between burner and boiler must be
airtight.
Fig. 6
3
1
5
4
Содержание RDB 2.2R BG 15 kW
Страница 2: ...Translation of the original instructions Traducci n de las instrucciones originales...
Страница 30: ......
Страница 58: ......
Страница 59: ......