20094184
18
GB
Start-up, calibration and operation of the burner
6.10 Operating programme
Normal operation
Lockout due to extraneous light during pre-purging
Lockout due to ignition failure
Key
(Fig. 17 - Fig. 18 - Fig. 19)
F
Flame detector
HT
Heat request thermostat
ID
Ignition device
K
Enabling switch thermostat for start up after preheating
FM
Fan motor
PH
Heater
V1
Oil valve
LED
Reset button LED colour
t1
Standby time
t2
Time for checking initialisation
t3
Pre-purging
time
t3i
Pre-ignition
time
t3l
Checks for extraneous light during pre-purging
t4i
Total ignition time
t4l
Reaction time to achieve safety shut-down due to flame
failure
t5i
Post-ignition time
tpp
Post-purging time
ts
Safety time
20076737
Flame loss during operation (Recycle: max. 3 attempts)
Green
blink
Orange
blink
Green blink
Green
Lockout
Green
blink
Orange
blink
Green blink
Green
POWER SUPPLY
F
a
st
red
Signal not requested
Fig. 17
link
F
LED
t
2
t
1
HT
FM
ID
V1
P
M
t
3
l
PH
K
t
s
20083033
Lockout
Green
blink
Red
Red, green blink
Orange blink
POWER SUPPLY
Fig. 18
Fig. 19
D11374
Red
Green
blink
Orange
blink
POWER SUPPLY
Green
blink
Lockout
Содержание RDB 2.2R BG 15 kW
Страница 2: ...Translation of the original instructions Traducci n de las instrucciones originales...
Страница 30: ......
Страница 58: ......
Страница 59: ......