3
This manual, Code 20109777 - Rev. 0 (02/2016)
comprises 52 page s .
CONTENTS
The following symbols are used in this manual:
9
CAUTION! =
Identifies actions that require caution and
adequate preparation.
0
STOP! =
Identifies actions that you MUST NOT do.
This manual, Code
- Rev.
comprises
page s .
1 GENERAL INFORMATION . . . . . . . . . . . . . . . . . . . . . . . . . . . .4
1.1
General Safety Information . . . . . . . . . . . . . . . . . . . . . . 4
1.2 Precautions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4
1.3
Description of the appliance . . . . . . . . . . . . . . . . . . . . . 5
1.4
Safety and control devices . . . . . . . . . . . . . . . . . . . . . . . 5
1.5
Identification. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6
1.6
System layout. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6
1.7
Technical specifications . . . . . . . . . . . . . . . . . . . . . . . . . 9
1.7.1 Water-side pressure drop. . . . . . . . . . . . . . . . . . . . . . . 10
1.8
Location of sensors . . . . . . . . . . . . . . . . . . . . . . . . . . . .11
1.9
Control panel . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12
2 INSTALLATION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .14
2.1
Unpacking the product . . . . . . . . . . . . . . . . . . . . . . . . 14
2.1.1 Positioning of labels. . . . . . . . . . . . . . . . . . . . . . . . . . . 14
2.2
Overall dimensions and weights . . . . . . . . . . . . . . . . . 14
2.3
Moving and removing the packing. . . . . . . . . . . . . . . . 15
2.4
Installation premises . . . . . . . . . . . . . . . . . . . . . . . . . . 16
2.4.1 Recommended minimum distances . . . . . . . . . . . . . . 16
2.5
Installation in older systems and systems requiring
modernisation. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16
2.6 Water connections . . . . . . . . . . . . . . . . . . . . . . . . . . . . .17
2.7
Typical water system schematics . . . . . . . . . . . . . . . . . 18
2.8 Fuel connections . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 19
2.9
Combustion gas exhaust . . . . . . . . . . . . . . . . . . . . . . . 20
2.9.1 Technical specifications of stack. . . . . . . . . . . . . . . . . . 20
2.9.2 Connection to the stack . . . . . . . . . . . . . . . . . . . . . . . . 20
2.10 System filling and emptying. . . . . . . . . . . . . . . . . . . . . 22
2.10.1 Water quality requirements . . . . . . . . . . . . . . . . . . . . . 22
2.10.2 Filling. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 22
2.10.3 Emptying . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 23
2.11 Wiring diagram . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 24
2.12 Electrical connections . . . . . . . . . . . . . . . . . . . . . . . . . 27
3 COMMISSIONING AND MAINTENANCE . . . . . . . . . . . . . . .29
3.1
Preparing for initial startup . . . . . . . . . . . . . . . . . . . . . 29
3.2
Initial startup. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 29
3.2.1 Ignition failure. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 30
3.2.2 Resetting the burner and safety thermostat. . . . . . . . . 31
3.3
Checks during and after initial start-up . . . . . . . . . . . . 31
3.3.1 Storage cylinder pump control . . . . . . . . . . . . . . . . . . . 32
3.3.2 Burner control and adjustment . . . . . . . . . . . . . . . . . . 33
3.3.3 Burner functioning and programming . . . . . . . . . . . . . 34
3.4
Temporary shutdown. . . . . . . . . . . . . . . . . . . . . . . . . . 43
3.5
Preparing for extended periods of disuse. . . . . . . . . . . 43
3.6 Cleaning and servicing the boiler . . . . . . . . . . . . . . . . . 44
3.7
Annual cleaning. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 44
3.7.1 Cleaning and servicing the boiler . . . . . . . . . . . . . . . . . 44
3.7.2 Cleaning the heat exchanger . . . . . . . . . . . . . . . . . . . . 46
3.7.3 Checking and replacing the storage cylinder anode (
GITRÈ
5 B/100
model). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 47
3.8 Extraordinary cleaning . . . . . . . . . . . . . . . . . . . . . . . . . 48
3.8.1 Cleaning the storage cylinder . . . . . . . . . . . . . . . . . . . . 48
3.9
External cleaning . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 48
3.10 Troubleshooting. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 49
4 RECYCLING AND DISPOSAL . . . . . . . . . . . . . . . . . . . . . . . .51