Riello GAS 5 P/M Скачать руководство пользователя страница 13

11 

2915246

GB

COMBUSTION ADJUSTMENT 

For the combustion adjustment we suggest to proceed in this way:
- Let the burner starts and after the flame ignites at the minimum output, disconnect the servomotor by opening the con-
nection 5) (page 1) placed on panel.
- Thereafter proceed successively to the adjustment of the maximum, minimal outputs and to the intermediate output.

MAXIMUM OUTPUT SETTING

Gas

- Disjoint the cam with adjustable profile 6) from the servomotor by re-setting the button 5).

- Turn manually clockwise the cam 6) till to reach the position of 130° (on the edge of the servomotor) in correspondence 
of the pointer 4). In this way the gas throttle valve 12) is at the max. opening - 90°-

- Join again the cam with adjustable profile 6) to the servomotor by pushing the button 5).

Now set the gas rate by acting on the gas setting valve.

Air

- Move the adjustable profile 7) of the cam by gradually acting on the screws 9).

MINIMAL OUTPUT SETTING

Gas

- Disjoint the cam with adjustable profile 6) by means of the button 5).

- Turn manually anticlockwise the cam till to reach the position of 30°.

- Lock it again and measure the gas rate.

If a different minimal output is desired, set free the cam with adjustable profile and turn it anticlockwise; for a higher output 
turn it clockwise. When the minimal value is satisfying, set on the cam 3) the opening value signed on the pointer 4).

Air

- Vary the profile of the cam 7) by gradually acting on the screws 9).

Be careful to not modify the part of profile controlling the air shutter at the maximum output, previously set.

INTERMEDIATE OUTPUTS SETTING

Gas

No setting is required.

Air 

It is carry out by acting on the screws 9) of the cam profile, being careful to not move those for the minimum and maximum 
outputs.
When the combustion setting is ended re-connect the electrical wiring of the servomotor by plugging the connector 5) 
(page 1); then lock the screws 9) by means of the cross-screws 8).

Содержание GAS 5 P/M

Страница 1: ...Installation use and maintenance instructions 2915246 2 07 2016 Forced draught gas burner Progressive two stage or modulating operation CODE MODEL TYPE 3753581 GAS 5 P M 535 T80 GB...

Страница 2: ...M These products are in compliance with the following Technical Standards EN 676 EN 12100 and according to the European Directives MD 2006 42 EC Machine Directive LVD 2014 35 UE Low Voltage Directive...

Страница 3: ...ration two stages progressive modulating kit with controller available upon request Fuel natural gas Pci 8 10 kWh m3 7000 8600 kcal m3 Minimum gas pressure for maximum output 9 8 mbar are needed measu...

Страница 4: ...NS COMBUSTION CHAMBER PRESSURE MAXIMUM OUTPUT Min output 155 kW 133 300 kcal h Boiler front plate drilling Length available with special blast tube to be separately required Burner 160 160 165 M12 D17...

Страница 5: ...ain 550 kW it is necessary a gas pressure of 9 mbar and the combustion head set as indicated at page 8 If the combustion chamber is pressurized at 2 mbar the pressure detected at the testpoint 9 is 9...

Страница 6: ...Loosen the screws 2 unhook the tension rod of the air damper 1 remove the connecting lead of the servomotor withdraw the group A from the group B After the setting re assemble and verify that the ten...

Страница 7: ...out y the factory Key to layout CMV Motor contactor LFL Control box MB Burner terminal strip MV Fan motor PA Air pressure switch RT Thermal cut out SM Servomotor SO Ionisation probe SP Plug socket TA...

Страница 8: ...urner must be stopped every 24 hours of operation by means of an hours counter to be connected in series with the adjustment devices Key to layout BP Pressure probe BT Temperature probe MB Burner term...

Страница 9: ...ontroller modulating version 8 Pre sheared holeg Further prospective signals or controls can be connected to the burner wiring terminal board by removing the metal weld nuts from the pre sheared holes...

Страница 10: ...justment pressure by turning slowly clockwise the knob till reaching the burner lock out Thereafter turn the knob anticlockwise for 1 mbar and repeat the burner start up for checking the regularity if...

Страница 11: ...he plate 4 Tighten the screws 1 Gas setting Loosen the screw 5 move the ring 6 so that the pointer 7 is coincident with the desired setpoint 8 Tighten the screw 5 Attention the set point number is the...

Страница 12: ...controls the min stroke and remains al ways positioned on 0 in this way when the burner is off the air damper is totally closed Orange cam it controls the minimal modulating power It is set by the fa...

Страница 13: ...file 7 of the cam by gradually acting on the screws 9 MINIMAL OUTPUT SETTING Gas Disjoint the cam with adjustable profile 6 by means of the button 5 Turn manually anticlockwise the cam till to reach t...

Страница 14: ...ange 25 50 the change from 90 to 60 of the tension rod will be sufficient Should this ratio be in higher range 50 100 in this case further to position the tension rod on 60 it shall be shortened Proce...

Страница 15: ...TION CURRENT The minimum current necessary for the control box operation is 6 A The burner normally supplies a higher current value so that no check is needed However if a measurement of the ionizatio...

Страница 16: ...operation of the flame detecting circuit because of probe to earth defective internal amplifier Stop during pre purge phase because of The servomotor does not change over the minimal opening circuit i...

Страница 17: ......

Страница 18: ......

Страница 19: ......

Страница 20: ...Subject to modifications RIELLO S p A I 37045 Legnago VR Tel 39 0442 630111 http www riello it http www riello com...

Отзывы: