Installation
5.10.3 Gas train installation
The gas train 1)(Fig. 15) leaves the factory ready for installation
to the burner's left.
If it is to be installed on the right, fit the valve turned by 90° with
respect to the gas-out flange and with the gas pressure switch
pointed upwards.
Connection between the gas supply line and the train must be
made using the gas-in flange 3) supplied, and fastening screws.
Connect the 6 pin plug 2)(Fig. 15) of the gas train to the 6-pole
socket 9)(Fig. 4 on pag. 10) of the burner.
DANGER
Disconnect the electrical power using the main
switch.
Check that there are no gas leaks.
Pay attention when handling the train: danger of
crushing of limbs.
Make sure that the gas train is properly installed
by checking for any fuel leaks.
WARNING
It is best to tighten screws in a criss-cross pattern.
Do not, under any circumstances, install the valve
with the coil facing down.
WARNING
Once installation is complete, you must check for
fuel leaks and make sure the gas train is working
properly.
20065208
Fig. 15