
24
GENERAL
ENGLISH
MA
MA
BL
TBT1
TBT2
2
3
5
6
TA 1 RS
MA
7
1
BL
Cavo ingresso
di rete 230V
MA
GI/VE
GI/VE
MA
MA
BL
BL
GI/VE
MA
BL
BL
MA
NE
NE
BL
MA
Fusibile 3.15A F
GI/VE
BL
GI/VE
MA
BL
4
TA 2 NE
VI
A1 BL
3/14 NE
4/11 NE
A2 NE
A2 RS
A1 BL
A2 BL
A1 MA
4-14
MA
5-24
MA
5-24
MA
6-21
MA
3-11
MA
6-21
MA
3-11
MA
4-14
MA
MA
BL
MA
BL
RS
BL
NE
BL
BL
GI/VE
MA
GI/VE
BL
BL
TA1 dopo aver
rimosso
ponticello ROSSO
in morsettiera
TA2 dopo aver
rimosso ponticello
NERO
in morsettiera
GI/VE
P2
BL
MA
GI/VE
P1
BL
MA
TBT1 - TBT2
dopo aver
rimosso
ponticello
VIOLA
in morsettiera
INGRESSO RICHIESTA
CALORE
CALDAIA o GENERATORE
1.9.2
BAG
3
2 AP wiring diagram
9
If the wiring or the board are replaced, observe and respect
all the connections of the cables according to the numbered
sequence shown in the
fi
gure.
NE
black
RS
red
BL
blue
VI
purple
GI/VE
yellow/green
MA
brown
BI
white
GR
gray
TBT
Low temperature thermostat (zone 1 - zone 2)
TA
Ambient thermostat
P
Circulator
Содержание 20082277
Страница 17: ...17 MANUTENZIONE ITALIANO...
Страница 34: ...34 MAINTENANCE ENGLISH...
Страница 35: ...35 MAINTENANCE ENGLISH...