6
1. Line up front of power head assembly
with vacuum port located on the front
of the drum, as shown.
2. Place power head assembly on top of
drum.
3. Be sure lid completely covers the top
of the drum so leakage does not
occur.
4. Push down on top of the drum latch
areas to cause the flexible locking tabs
to hook onto the drum channel.
5. Make sure that the locking tabs are
snapped in place to prevent the lid
from coming off. (See inset).
Your new Wet/Dry Vac is ready for use.
Wet/Dry Vac Assembly
Drum
Out
Flexible
Locking Tab
Drum
Channel
Top Assembly
Pull Out
Flexible
Locking
Tab
Push
Down
Push
Down
Insert Hose
Insert the push button end of the “Tug-a-
Long” hose into the inlet of the Vac. The
hose should snap into place. To remove
the hose from the Vac, press the release
button in the hose assembly and pull the
hose out of the Vac inlet, as shown.
Power
Head
Assembly
Vacuum
Port
Release Button
SP6765-1 12 GALLON 1/19/11 4:53 PM Page 6