SH-P1 Training
44
Slide 44
Replacing the Controller – 1
Print out the SMC first.
When you replace the controller, remove the 2
NVRAMs from the old controller and install them
on the new one.
Make sure the NVRAMs are oriented correctly.
The notches should be oriented as shown in the
illustration on the next slide.
The 45 ppm and 50 ppm machines have different
controller boards. Don't mix them up!
Don't change the DIP switches.
Refer to the FSM for the detailed controller
replacement procedure.
No additional notes.
Содержание SH-P1 Series
Страница 3: ...SH P1 Training 3 Slide 3 PRODUCT OUTLINE Introduction No additional notes...
Страница 12: ...SH P1 Training 12 Slide 12 Product Outline Options and Consumables No additional notes...
Страница 18: ...SH P1 Training 18 Slide 18 Installation No additional notes...
Страница 21: ...SH P1 Training 21 Slide 21 Transporting the Machine No additional notes...
Страница 23: ...SH P1 Training 23 Slide 23 Maintenance No additional notes...
Страница 45: ...SH P1 Training 45 Slide 45 Replacing the Controller 2 Notches Orient the NVRAMs as shown No additional notes...
Страница 60: ...SH P1 Training 60 Slide 60 Laser Exposure No additional notes...
Страница 65: ...SH P1 Training 65 Slide 65 All In One Cartridge AIO...
Страница 75: ...SH P1 Training 75 Slide 75 Fusing and Paper Exit No additional notes...
Страница 78: ...SH P1 Training 78 Slide 78 Electrical Components 1 Fusing lamp 2 Thermistor 3 Thermostats No additional notes...