1.Installation
13
[G]: Power Connector
[H]: Main Power Switch
[I]: Diagnostic LEDs (For service use only)
[J]: Service Switches (For service use only)
Connecting E-25C to the Copier
After you unpack the E-25C, connect the E-25C to the copier before you connect it to the network. This
is to confirm that there are no problems with the hardware and controller itself.
Preparing the Copier
Before doing the following steps, turn OFF the controller main power switch and copier main
power switch, and disconnect the power cords.
1.
Remove the rear cover [A].
2.
Remove the controller box cover [A].
Red Circle: Remove / Blue Circle: Loosen
Содержание D3GF
Страница 2: ......
Страница 6: ......
Страница 13: ...1 Installation 7 Installation Flow Chart Recommended installation steps are as follows ...
Страница 46: ...1 Installation 40 If activation does not require a restart Server Option Client Option ...
Страница 59: ...2 General Operations For Servicing 53 5 Touch Restart System 6 Wait until the E 25C reboots and becomes idle ...
Страница 71: ...3 Replacement 65 Cover Removal Side Cover for the E 25C 1 Remove the side cover A ...
Страница 93: ...4 System Maintenance 87 Command WorkStation For details refer to the Command WorkStation help ...
Страница 187: ...7 Specifications 181 H 4 9 x 14 3 x 11 6 Weight 5 5 kg 12 2 lb ...