Series Series
KNAR/F, KNARP/F, KNAR-D/F, KNARP-D/F,
Page 13
KNAR-S/F, KNARP-S/F
ASME
9520-082-en
Revision 14
TM 9549
Edition 11/2017
Tighten setscrew
904/4
in the coupling
804
.
Tighten sleeve nut
512
on the coupling
tight.
Attention: Left-hand thread.
Observe drawing in
Section 10.3 and 10.5
.
9.3 Conversion from lever to
actuator
Select the actuator in accordance with the
instructions of the actuator manufacturer.
Remove hand lever
203
.
Remove lever stop
577
and plug.
Check the fits of the coupling
804
, bracket
510
and actuator
850
.
Mount bracket
510
with the opening at right angles
to the direction of flow.
Mount coupling
804
and actuator
850
. While doing
so, observe direction of rotation of the v-control
ball/stem unit.
Observe the actuator position in accordance with
the actuator operating manual.
Tighten setscrew
904/4
in the coupling
804
.
Tighten sleeve nut
512
on the coupling tight.
Attention: Left-hand thread
.
Observe drawing in
Section 10.3 and 10.5
.
10 Drawings
10.1 Legend
101
main body
102
body end piece
201
ball/stem unit
203
lever
401
seat ring
403
packing bellows
405/1
thrust ring
502
spring gland follower
503
packing gland follower
510
bracket
526
retaining washer
(DN ½“, ¾“, 1“, 1½“, 2", 3", 4")
554/1
washer
554/5
washer
(3”)
557
grounding spring washer
577
lever stop
804
coupling
includes:
512
sleeve nut
904/4
setscrew
980/1
round head grooved pin
850
actuator
901/x
hex. screw
902/1
stud screw
904/1
set screw
914/2
hex. socket screw
(2")
918/1
threaded rod
(6", 8")
920/x
hex. nut
936/x
toothed lock washer