GTR061 Installation Manual:
Rev 3
11
Step 2 - Motor Pad Footing (Minimum Requirement):
• The motor pad concrete footing requires an area of no less than 450mm long x 300mm
wide and a minimum depth of 200mm (Standard requirement).
• Ensure surface is level and parallel to the driveway
•
Concrete pad should be min 20-25MPA
(Rapid Set Concrete not recommended)
allow to cure for 7-10 days before drilling and securing the mounting plate into position.
Step 3 - Motor Position Installation:
• Insert the key and open the manual release bar to put the motor into manual mode, and check
that the motor cog rotates freely by hand (As per Fig 17).
• Place the motor and motor mounting plate on the concrete pad.
• Make sure the distance between the gate motor cog and gear rack position are aligned.
• Mark all four corners of the mounting plate on the concrete pad using a pencil, chalk or similar,
to ensure the mounting plate is in the correct position before drilling.
• Remove motor from the mounting plate.
Mounting Plate Dimensions:
Fig 4
Fig 5
Fig 6
21-17mm
53-57mm
Sliding Gate Frame (in open position)
Mark
corners
of the
mounting
plate with
a pencil,
chalk, or
similar.
Once the gate has been placed onto the gate motor the gate must move back
and forth freely at all times when in manual release mode
When mounting and positioning the motor ensure that the power cable is unplugged. The motor
cover will need to be removed to mount the motor to the mounting plate.