![Rice Lake RoughDeck FXB Скачать руководство пользователя страница 15](http://html1.mh-extra.com/html/rice-lake/roughdeck-fxb/roughdeck-fxb_installation-manual_1454224015.webp)
Service Information
© Rice Lake Weighing Systems
●
All Rights Reserved
11
5.2 Load Cell Replacement
Replacement load cells can be ordered from Rice Lake Weighing Systems (
. To replace a load cell in an FXB
follow the steps listed below.
1.
Remove the deck assembly.
2.
Loosen the bottom locking nut (
).
3.
Remove the signal cable access hole cover plate. Pull wire rope from the plate and pass it through base.
4.
Remove bottom lock nut from wire rope and back off upper lock nut. Using a hex allen wrench on the flathead bolt, and
an adjustable wrench to hold the load cell body, remove the load cell.
5.
Remove the wire rope from the defective load cell and screw it into the new load cell to approximate position it was in
the old cell.
6.
Insert the wire rope into the nose iron hold and turn the lower nut on loosely.
7.
Hold flat washer in place, and screw flathead bolt into top of the load cell. Tighten the flathead bolt securely using a
hex allen wrench and adjustable wrench.
8.
Tighten the lower lock nut on the wire rope against the nose iron (finger tightening only). Lock upper nut down against
the nose iron.
9.
Pass the signal cable through the access hole and follow directions from
10.
Replace the deck assembly and recalibrate according to
.
5.3 Replacement Parts List and Accessories
Please refer to the Replacement Parts catalog, PN 32288 or the Rice Lake Weighing Systems website at
https://www.ricelake.com/en-us/resources/catalogs
for a complete list of replacement parts and accessories for the RoughDeck
FXB.
Содержание RoughDeck FXB
Страница 1: ...RoughDeck FXB Flexure Lever Floor Scale Installation Manual April 6 2020 PN 32958 Rev C...
Страница 16: ...RoughDeck FXB 12 Visit our website www RiceLake com...
Страница 17: ......