2.4 Assembly

1. Cut bands holding the load cell package from lever arm and remove the load cell with wire rope.

  The load cell is a delicate device and can be damaged if dropped, twisted when mounting, or shock loaded.

2. Insert a block under the primary lever so it fits snugly. Remove the shipping bolt and spacer. The shipping bolt is 

placed between the load cell support frame and the nose iron (in place of load cell) during shipping (see 

Figure 2-4 

and Figure 2-5

).

3. The load cell is shipped with wire rope. Remove the outer nut from the load cell wire rope..

Figure 2-4. Load Cell Setup

4. Screw the inner nut on the wire rope flush with the top of the threads.
5. Remove the load cell mounting bolt from the top of the cell.
6. Screw the short threaded end of the wire rope through the bottom of the load cell until it’s flush with the top.

  The weigh platform frame and scale base are marked on the corner near the load cell for proper assembly.

7. Carefully lower the load cell into position at an angle so the wire rope threaded rod end goes through the hole of the 

nose iron first. If used, position the spacer between the load cell support frame and the load cell.

The 3/4" spacer is used beginning with the 30" x 30" 2000 lb model and those higher, with the exception of the 48" x 

48" 20000 lb models which use a 1" spacer. 

8. Position the load cell so the signal cable will travel directly out of the exit hole in the base as shown in 

Figure 2-5.

 

Figure 2-5. FXB Interior

CAUTION

Load cell support frame

3/4" or 1" spacer (see note 

below on spacer sizes)

Inner (top) nut

Nose iron

Outer (bottom) nut)

Wire rope

Load cell

Note

Note

Load cell 

spacer

Exit hole for the 

signal cable

Содержание RoughDeck FXB

Страница 1: ...RoughDeck FXB Flexure Lever Floor Scale Installation Manual April 6 2020 PN 32958 Rev C...

Страница 2: ...marks of their respective companies All information contained within this publication is to the best of our knowledge complete and accurate at the time of publication Rice Lake Weighing Systems reserv...

Страница 3: ...troduction 1 1 1 Safety 1 1 2 Scale Components 2 1 3 Operating Requirements 3 1 4 Flexure Lever Operation 3 2 0 Installation 4 2 1 Unpacking the FXB 4 2 2 Inspecting the RoughDeck FXB 5 2 3 Site Prepa...

Страница 4: ...RoughDeck FXB ii Visit our website www RiceLake com Rice Lake continually offers web based video training on a growing selection of product related topics at no cost Visit www ricelake com webinars...

Страница 5: ...ation that if not avoided will result in death or serious injury Includes hazards that are exposed when guards are removed Indicates a potentially hazardous situation that if not avoided could result...

Страница 6: ...ope runs from one end of the load cell to the tip of the primary lever 4 Flexure Plates Flat high strength thin plates that transmit the load forces due to the weigh applied to the platform and to the...

Страница 7: ...orizontal Load Cell Excitation Rated Excitation 10 VDC Maximum Excitation 15 V Safe Static Overloading Capacity Maximum 150 of the scale capacity Temperature Compensated range 0 to 150 F 18 to 65 C 1...

Страница 8: ...ck frame together and use eye bolts to lift depending on its size 3 Lift scale base from the wooden pallet by connecting eye bolts not included into threaded holes in the side channels of the scale Fi...

Страница 9: ...e scale and the indicator must be protected against crushing cutting or moisture damage Protect the cable by running it in conduit Do not allow the cable to lay in water For proper operation the scale...

Страница 10: ...op of the cell 6 Screw the short threaded end of the wire rope through the bottom of the load cell until it s flush with the top The weigh platform frame and scale base are marked on the corner near t...

Страница 11: ...errors when the scale is loaded 14 Screw the strain relief fitting into the side of the base 15 Route the load cell cable through the strain relief fitting Verify that the cable is not touching any p...

Страница 12: ...ed to step 3 3 Remove the deck plate and weigh platform frame 4 Loosen all check link mounting bolts Figure 1 1 on page 2 5 Loosen the top and bottom load flexure gripper plate bolts on the corner to...

Страница 13: ...specified centers with one channel extended 12 and equipped with a bolt on pipe stand weight indicator column The weight indicator display is 54 above the floor For models larger than 48 x 60 consult...

Страница 14: ...Ground shield not connected to cannon plug or meter shield Loose connection in the junction box Non linear Weight Reading Center flexure is offset from the center line Damage to the load cell Misalign...

Страница 15: ...he new load cell to approximate position it was in the old cell 6 Insert the wire rope into the nose iron hold and turn the lower nut on loosely 7 Hold flat washer in place and screw flathead bolt int...

Страница 16: ...RoughDeck FXB 12 Visit our website www RiceLake com...

Страница 17: ......

Страница 18: ...anada Mexico 800 321 6703 International 715 234 9171 Europe 31 0 26 472 1319 Rice Lake Weighing Systems is an ISO 9001 registered company Rice Lake Weighing Systems Specifications subject to change wi...

Отзывы: