OPERATION
TW120 01/11
Operation Section 4-45
© 2011 Alamo Group Inc.
OPERA
T
ION
13.2 Hauling the Tractor and Implement
Before transporting a loaded tractor and implement, measure the height and width dimensions and gross
weight of the complete loaded unit. Ensure that the load will be in compliance with the legal limits set for the
areas that will be traveled through
Use adequately sized and rated trailers and equipment to transport the tractor and implement. Consult an
authorized dealer to determine the proper equipment required. Using adequately sized chains, heavy duty
straps, cables and/or binders, securely tie down both the front and rear of the tractor utilizing the proper tie
down locations as specified by the tractor manufacturer.
Arrange the chains so that when tightened, the chains are pulling downward and against themselves. Carefully
tighten the securing chains or other fasteners using boomers or binders to apply maximum tension. Use
extreme care when attaching and removing the securing devices as the extreme tension involved when
released has the potential to inflict serious injury.
While hauling the tractor and implement, make occasional stops to check that the tractor and implement have
not moved or shifted and that the securing chains have maintained tension. If during transport a hard braking,
sharp turning, or swerving action was performed, stop at the next safe location to inspect the security of the
load.
Reduce speed before turning or applying the brakes.
Ensure that both brake pedals are locked together
when operating on public roads.
OPS-U- 0023
Содержание TW120
Страница 9: ...Safety Section 1 1 2011 Alamo Group Inc SAFETY SECTION...
Страница 28: ...SAFETY TW120 01 11 Safety Section 1 20 2011 Alamo Group Inc SAFETY Decal Description...
Страница 29: ...SAFETY TW120 01 11 Safety Section 1 21 2011 Alamo Group Inc SAFETY...
Страница 30: ...SAFETY TW120 01 11 Safety Section 1 22 2011 Alamo Group Inc SAFETY...
Страница 31: ...SAFETY TW120 01 11 Safety Section 1 23 2011 Alamo Group Inc SAFETY...
Страница 32: ...SAFETY TW120 01 11 Safety Section 1 24 2011 Alamo Group Inc SAFETY...
Страница 33: ...SAFETY TW120 01 11 Safety Section 1 25 2011 Alamo Group Inc SAFETY...
Страница 34: ...SAFETY TW120 01 11 Safety Section 1 26 2011 Alamo Group Inc SAFETY...
Страница 35: ...SAFETY TW120 01 11 Safety Section 1 27 2011 Alamo Group Inc SAFETY...
Страница 36: ...SAFETY TW120 01 11 Safety Section 1 28 2011 Alamo Group Inc SAFETY...
Страница 38: ......
Страница 39: ......
Страница 65: ......
Страница 91: ...Introduction Section 2 1 2011 Alamo Group Inc INTRODUCTION SECTION...
Страница 96: ......
Страница 97: ...Assembly Section 3 1 2011 Alamo Group Inc ASSEMBLY SECTION...
Страница 109: ...Operation Section 4 1 2011 Alamo Group Inc OPERATION SECTION...
Страница 156: ......
Страница 157: ...Maintenance Section 5 1 2011 Alamo Group MAINTENANCE SECTION...
Страница 160: ...MAINTENANCE TW120 01 11 Maintenance Section 5 4 2011 Alamo Group MAINTENANCE...
Страница 161: ...MAINTENANCE TW120 01 11 Maintenance Section 5 5 2011 Alamo Group MAINTENANCE...
Страница 174: ...MAINTENANCE TW120 01 11 Maintenance Section 5 18 2011 Alamo Group MAINTENANCE...
Страница 188: ...Secci n de Seguridad 1 1 2011 Alamo Group Inc SECCI N DE SEGURIDAD...
Страница 189: ......