OPERATION
TW120 01/11
Operation Section 4-20
© 2011 Alamo Group Inc.
OPERA
T
ION
8.1 Tractor Pre-Operation Inspection/Service
Refer to the tractor operator’s manual to ensure a
complete pre-operation inspection and scheduled
service is performed according to the
manufacturers recommendations. The following
are some of the items that require daily service and
inspection:
•
Tire condition/air pressure
•
Wheel lug bolts
•
Steering linkage
•
PTO shield
•
SMV sign is clean and visible
•
Tractor’s lights are clean and functional
•
Tractor Seat belt is in good condition
•
Tractor ROPS is in good condition
•
ROPS is in the raised position
•
No tractor oil leaks
•
Radiator free of debris
•
Engine oil level and condition
•
Engine coolant level and condition
•
Power brake fluid level
•
Power steering fluid level
•
Fuel condition and level
•
Sufficient lubrication at all lube points
•
Air filter condition
OPS-U-0030
Содержание TW120
Страница 9: ...Safety Section 1 1 2011 Alamo Group Inc SAFETY SECTION...
Страница 28: ...SAFETY TW120 01 11 Safety Section 1 20 2011 Alamo Group Inc SAFETY Decal Description...
Страница 29: ...SAFETY TW120 01 11 Safety Section 1 21 2011 Alamo Group Inc SAFETY...
Страница 30: ...SAFETY TW120 01 11 Safety Section 1 22 2011 Alamo Group Inc SAFETY...
Страница 31: ...SAFETY TW120 01 11 Safety Section 1 23 2011 Alamo Group Inc SAFETY...
Страница 32: ...SAFETY TW120 01 11 Safety Section 1 24 2011 Alamo Group Inc SAFETY...
Страница 33: ...SAFETY TW120 01 11 Safety Section 1 25 2011 Alamo Group Inc SAFETY...
Страница 34: ...SAFETY TW120 01 11 Safety Section 1 26 2011 Alamo Group Inc SAFETY...
Страница 35: ...SAFETY TW120 01 11 Safety Section 1 27 2011 Alamo Group Inc SAFETY...
Страница 36: ...SAFETY TW120 01 11 Safety Section 1 28 2011 Alamo Group Inc SAFETY...
Страница 38: ......
Страница 39: ......
Страница 65: ......
Страница 91: ...Introduction Section 2 1 2011 Alamo Group Inc INTRODUCTION SECTION...
Страница 96: ......
Страница 97: ...Assembly Section 3 1 2011 Alamo Group Inc ASSEMBLY SECTION...
Страница 109: ...Operation Section 4 1 2011 Alamo Group Inc OPERATION SECTION...
Страница 156: ......
Страница 157: ...Maintenance Section 5 1 2011 Alamo Group MAINTENANCE SECTION...
Страница 160: ...MAINTENANCE TW120 01 11 Maintenance Section 5 4 2011 Alamo Group MAINTENANCE...
Страница 161: ...MAINTENANCE TW120 01 11 Maintenance Section 5 5 2011 Alamo Group MAINTENANCE...
Страница 174: ...MAINTENANCE TW120 01 11 Maintenance Section 5 18 2011 Alamo Group MAINTENANCE...
Страница 188: ...Secci n de Seguridad 1 1 2011 Alamo Group Inc SECCI N DE SEGURIDAD...
Страница 189: ......