
3
IMPORTANT: TO INSURE PROPER INSTALLATION AND OPERATION OF
THIS PRODUCT, COMPLETELY READ ALL INSTRUCTIONS PRIOR TO
ATTEMPTING TO ASSEMBLE, INSTALL, OPERATE, MAINTAIN OR REPAIR
THIS PRODUCT. UPON UNPACKING OF THE FURNACE, INSPECT ALL
PARTS FOR DAMAGE PRIOR TO INSTALLATION AND START-UP.
CONTENTS
Safety Precautions ...................................................................................................1
Installation Check List ..............................................................................................2
Location Requirements and Considerations ............................................................4
Combustion and Ventilation Air ..............................................................................10
Vent Pipe Installation..............................................................................................13
Gas Supply and Piping...........................................................................................16
Electrical Wiring......................................................................................................20
Accessories ............................................................................................................21
Start-Up Procedures...............................................................................................26
Air Flow...................................................................................................................29
Maintenance...........................................................................................................34
Troubleshooting......................................................................................................36
Wiring Diagrams.....................................................................................................43
➤
Installation Instructions are updated on a regular basis. This is done as
product changes occur or if new information becomes available. In this
publication, an arrow (
➤
) denotes changes from the previous edition or additional
new material.
Содержание RGDG
Страница 22: ...22 I400 FIGURE 19 HONEYWELL NO S9201E2001 CONTROL BOARD TWINNING CONNECTION SINGLE STAGE OPERATION...
Страница 23: ...23 FIGURE 20 HONEYWELL NO S9201E2001 CONTROL BOARD TWINNING CONNECTION TWO STAGE OPERATION I400...
Страница 30: ...30 BLOWER PERFORMANCE DATA RGDG RGPH UPFLOW HORIZONTAL MODELS BLOWER PERFORMANCE DATA RGLH DOWNFLOW MODELS...
Страница 31: ...31 BLOWER PERFORMANCE DATA RGVH HORIZONTAL MODELS BLOWER PERFORMANCE DATA RGDJ RGPJ UPFLOW HORIZONTAL MODELS...
Страница 32: ...32 BLOWER PERFORMANCE DATA RGLJ DOWNFLOW MODELS ONLY BLOWER PERFORMANCE DATA RGVJ HORIZONTAL MODELS...
Страница 35: ...35 FIGURE 31 FILTER RETAINING RODS SIDE RETURN FIGURE 32 DOWNFLOW FILTER INSTALLATION...
Страница 43: ...FIGURE 36 FOR MODELS WITH UTEC 1012 920 OR HONEYWELL S9201E2001 INTEGRATED FURNACE CONTROL 43...
Страница 44: ...44 FIGURE 37 FOR MODELS WITH WHITE RODGERS 50A62 101 INTEGRATED FURNACE CONTROL...
Страница 45: ...45 FIGURE 38 FOR MODELS WITH UTEC 1012 925 INTEGRATED FURNACE CONTROL...
Страница 46: ...46...
Страница 47: ...47...
Страница 48: ...48 CM 398 Rheem Manufacturing Company Air Conditioning Division Fort Smith Arkansas...