![Rheem Raypak Hi Delta 302C Скачать руководство пользователя страница 3](http://html1.mh-extra.com/html/rheem/raypak-hi-delta-302c/raypak-hi-delta-302c_installation-and-operation-manual_4133547003.webp)
3
CONTENTS
1. WARNINGS
............................................................ 4
Pay Attention to these Terms ..................................4
2. GENERAL SAFETY
................................................ 5
Time/Temperature Relationships in Scalds .............5
3. COLD WATER START ........................................... 5
Installation ...............................................................
6
Check the Power Source ........................................
6
Mounting the Control Box........................................
6
Installing the Temperature Sensor ..........................
6
Connecting the Valve Assembly ..............................
6
Connecting Power to the Controller ........................
8
Connecting Boiler to Cold Water Start ...................
8
Operation ................................................................
8
Cold Start Sequence of Operation ..........................9
Troubleshooting ....................................................10
Mounting the Actuator to the Valve .......................10
Verifying Ball Position............................................10
Installing the Three-Way Valve .............................. 11
High Pressure Tab ................................................. 11
Cold Water Start Troubleshooting Guide ..............12
Typical Cold Water Start Piping ...........................13
Wiring Diagrams–Cold Water Start .......................14
Heater Interface Wiring .........................................15
4. COLD WATER START-MULTIPLE BOILER
......
16
Materials Included .................................................16
Installation .............................................................16
Mounting the Control Boxes ..................................16
Installing the Temperature Sensor ........................16
Installing the Three-way Valve ..............................16
Connecting Power to the Controller ......................16
Connecting the CWS Control to the Multi-Boiler
Interlock Box ................................................16
Connecting the Boiler to the CWS Multi-Boiler
Interlock .......................................................16
Actuator to Valve Orientation ................................16
Three-Way Valve Ball Orientation .........................17
Valve Installation ...................................................17
4-Inch Valve Orientation ........................................17
Connecting the Actuator ........................................18
Typical Cold Water Start Multiple Boiler Piping .... 19
Wiring Diagram .....................................................20
5. COLD WATER RUN ..............................................
21
Purpose .................................................................21
Typical Cold Water Run Applications ....................21
CWR vs. CWS .......................................................21
Installation .............................................................21
Installation Codes..................................................21
Mounting the Control Box......................................21
Injector & Heater Pump Comparison ....................22
Check the Power Source ......................................24
Injector Pump Wiring .............................................24
Injection Pump Cover Installation..........................25
Typical Cold Water Run Piping - Heating Apps ..... 27
Typical Cold Water Run Piping - Pool Apps ..........27
Operation ..............................................................28
Cold Run Sequence of Operation .........................28
Cold Water Run Troubleshooting Guide ...............29
Wiring Diagrams ....................................................30
6. REPLACEMENT PARTS
.....................................
31
7. ILLUSTRATED PARTS LISTS ............................ 32
Содержание Raypak Hi Delta 302C
Страница 14: ...14 Wiring Diagrams Cold Water Start...
Страница 19: ...19 CWS CONTROL BOX ASSY SEE PAGE 16 FOR HEATER INTERFACE WIRING SEE PAGE 17 Wiring Diagram Multiple Boiler...
Страница 29: ...29 Wiring Diagrams Cold Water Run SEE PAGE 17...
Страница 31: ...31 7 ILLUSTRATED PARTS LISTS Cold Water Start Manufactured from 2006 through current...
Страница 32: ...32 1 M 8 M Cold Water Start...
Страница 33: ...33 Cold Water Start Multiple Boiler Interlock...
Страница 34: ...34 NOTE Sizing is specific to the application...
Страница 36: ...36 9 M 4 M RAYTHERM MODELS 2100 4001 ONLY 1 H 5 M 6 M 7 M 8 M 10 M 12 M 11 M 4 M 2 M 1 M Cold Water Run...
Страница 37: ...37 NOTE Sizing is specific to the application...
Страница 38: ...38 NOTES...
Страница 39: ...39 NOTES...